Agents Index

DC Hub

Online

Orchestration layer for data center and energy intelligence. Start with execute_plan.

Visit publisherConnectJSON

What it can do: 80 tools

  • execute_plan read-onlyUse this when a data center question spans several topics: one-call planner over grid headroom and power availability, interconnection queues, PPAs and energy pricing, power generation, gas and energy infrastructure (the
  • get_api_keyUse this when the user wants more DC Hub data center data than keyless allows, or asks for a key; no key is needed to start. DATA USE: the optional email, used to make the key recoverable and send its weekly lookup summa
  • search read-onlyUse this when a Deep Research or ChatGPT-connector client needs a data center facility search (search/fetch format). Returns a list of matching data-center facilities as {id, title, url}; pass an id to the `fetch` tool f
  • fetch read-onlyUse this when you have an id from `search` and need that data center facility record (search/fetch format). Returns {id, title, text, url, metadata} — a citable public summary of one data-center facility (name, operator,
  • search_facilities read-onlyUse this when the user asks which data centers exist, or who operates in a city, state or country; filters: country, state, city, operator, MW range, tier or text. Returns name, operator, location, market, status and MW
  • get_facility read-onlyUse this when the user asks about one data center facility: name, operator, address, lat/lon, power capacity (MW total/used), cooling type, fiber providers (count + carrier list), commissioning year, status, the DCPI ver
  • get_market_intel read-onlyUse this when the user asks about a data-center market (metro supply, operators, pipeline, pricing): facility count, tracked MW, status mix, top providers, recent facilities or lease pricing. Pass market as a slug (e.g.
  • get_market_dcpi_rank read-onlyUse this when the user asks where a data center can get grid power, how fast, or whether a market is a BUILD, CAUTION or AVOID (e.g. "Where can a 100 MW data center get power fastest?"): DCPI scores 300+ markets daily on
  • predict_market_trajectory read-onlyUse this when the user asks where a data center market's power outlook is heading (next 1-8 quarters). Projects excess_power_score and constraint_score forward with confidence bands that WIDEN with horizon, from DC Hub's
  • get_gas_index read-onlyUse this when the user asks which US states suit gas-fired data center power: the Data Center Gas Index (DCGI), a per-state score. ★ DO NOT COMPARE a DCGI figure published before 2026-08-08 with one published now — they
  • get_gas_economics read-onlyUse this when the user asks what behind-the-meter gas power costs in a US data-center market: Henry Hub spot, regional basis differential, and the delivered industrial + electric gas tariff ($/MMBtu), each with its own s
  • get_grid_scoreboard read-onlyUse this when the user asks how power grids compare: demand, fuel mix or renewable share. GLOBAL grid scoreboard — 9 US grid operators (the 7 US ISOs PJM, ERCOT, CAISO, MISO, SPP, NYISO, ISO-NE, plus BPA and TVA) + Great
  • compare_isos read-onlyUse this when the user asks to compare two to four power grids side by side — fuel mix, demand, renewable/gas share, and for the US ISOs interconnection-queue depth and time-to-power — in one call instead of N sequential
  • get_intelligence_index read-onlyUse this when the user asks how the data center market looks overall, across all markets: ONE global DC Hub index, not a per-market score, and it takes no arguments (no market filter). Returns a global pulse score (0-100
  • list_transactions read-onlyUse this when the user asks about data center M&A, acquisitions or capital deals — tracked deals (2019-present; total_count in the result, where shown, gives the live number), each with its disclosed value where public (
  • get_news read-onlyUse this when the user asks for data center industry news or headlines (execute_plan also pulls news inside a broader market question). Curated data center industry news from 40+ trade sources (DCD, Data Center Knowledge
  • semantic_search read-onlyUse this when a data center or energy question is conceptual or fuzzy and keyword filters fall short — semantic (meaning-based) retrieval across DC Hub's industry news, M&A deals, the global facility map, per-market DCPI
  • search_intelligence read-onlyUse this when you need meaning-based search over DC Hub's data center intelligence corpus, choosing corpora — industry news, M&A deals, discovered facilities, per-market DCPI narratives, press releases, announcements, pe
  • get_market_context read-onlyUse this when you need a whole data center market briefing for your context window — one call returns a token-budgeted context pack for a data-center market: DCPI verdict, power & grid facts, the Claude-written 12-month
  • get_iso_context read-onlyUse this when you need a whole power grid (ISO) briefing for your context window — one call returns a token-budgeted context pack for a US ISO/RTO: live grid snapshot (demand, fuel-mix shares), DCPI verdict mix & grid ec
  • get_pipeline read-onlyUse this when the user asks what data centers are being built, announced or permitted in a market or by an operator. Example: "What is under construction in Northern Virginia and when does it come online?" — get_pipeline
  • get_power_pipeline read-onlyUse this when the user asks where new power generation is coming online (the forward supply pipeline) — e.g. "how much new generation is planned in Virginia / the Southeast / ERCOT, and when?". Planned, permitting, and u
  • get_infra_projects read-onlyUse this when the user asks what gas pipeline or transmission line projects are planned, proposed, approved or under construction — the forward build-out, not the existing network. e.g. "which interstate gas pipelines ar
  • get_power_availability_timeline read-onlyUse this when the user asks when power will be available, or about time-to-power, in a US state: year by year. Composes: new generation coming online from EIA-860M monthly, split by confidence class (under-construction v
  • get_global_power read-onlyUse this when the user asks about power plants worldwide or in a non-US country — operating AND the forward pipeline (announced / pre-construction / under-construction), across ALL fuels (coal, oil/gas, nuclear, solar, w
  • get_interconnection_queue read-onlyUse this when the user asks about grid interconnection queues: how congested an ISO's queue is or how much data-center load is waiting. Returns queued generation GW per ISO. The projects field changes shape: with iso= it
  • get_refined_queue read-onlyUse this when you need interconnection queue projects filtered server-side. Instead of pulling the raw queue into context to filter (token-expensive, error-prone), push the predicates to the data layer and get back ONLY
  • get_retirement_headroom read-onlyUse this when the user asks where retiring power plants free grid capacity: scans EIA-860M retirements to find near-term transmission grid headroom — a retiring plant is a CONCRETE headroom event (its POI frees injection
  • get_hosting_capacity read-onlyUse this when the user asks how many MW a distribution feeder can take: utility-published hosting capacity — the MW a NAMED distribution feeder can actually take, straight from the utility's own hosting-capacity GIS. Pub
  • analyze_parcel read-onlyUse this when the user has a land parcel for a data center site: structured read of its boundary — pass your own GeoJSON Polygon/MultiPolygon, OR just lat+lon and DC Hub finds the containing parcel in its HOSTED parcel-b
  • rank_sites read-onlyUse this when you have enriched candidate data center sites to rank under constraints — the normalization contract that lets you compare sites across separate analyze_site calls WITHOUT dropping into code. Pass candidate
  • discover_tools read-onlyUse this when you are unsure which DC Hub data center, power or grid tool fits: lists tools by family. Returns _entity=tool_families — a front_door block (execute_plan for any multi-capability question, get_changes to re
  • plan_query read-onlyUse this when you want to see the plan for a data center question without running it (execute_plan runs the same planner and returns the answers). Reach for plan_query only to review, log, diff or audit a plan before exe
  • save_to_shortlistUse this when the user wants to keep a data center site on a named shortlist that survives across conversations (Phase 5 statefulness). Snapshots the site's objectives + its current percentile objective_score, so you can
  • get_shortlist read-onlyUse this when the user wants to see a saved data center site shortlist. With refresh=true (default) each site is RE-SCORED against the current national percentile baseline and returns saved_score, current_score, and scor
  • set_shortlist_alertUse this when the user wants a drift alert on a saved site shortlist so you can stop polling and be notified when a site's national standing moves materially (Phase 5). Fires when any site in the shortlist has current pe
  • suggest_reallocation read-onlyUse this when a saved data center site drifts (its national standing dropped — surfaced by get_shortlist refresh or a set_shortlist_alert firing), get replacement candidates from the rest of that shortlist so the alert b
  • get_grid_data read-onlyUse this when the user asks for live electricity grid data (power demand, fuel mix) for one grid: the 7 US ISOs (PJM, ERCOT, CAISO, MISO, SPP, NYISO, ISO-NE), TVA, BPA, 40+ US utility balancing authorities (e.g. AZPS, SO
  • get_changes read-onlyUse this when the user asks what changed in data center markets, facilities or deals since a date. Returns DCPI 7-day market movers, newly discovered facilities, new M&A deals + news, bill status changes on data-center b
  • get_facility_risk_delta read-onlyUse this when the user asks how a data center facility's (or its market's) power risk changed recently — "has this site gotten riskier lately?". Returns the REAL DCPI market-health delta (excess-power score change over t

…and 40 more.

Connect it

Claude Code
claude mcp add --transport http dc-hub https://dchub.cloud/mcp
Claude.ai / ChatGPT
Settings → Connectors → Add custom connector
URL: https://dchub.cloud/mcp
Cursor (~/.cursor/mcp.json)
{
  "mcpServers": {
    "dc-hub": {
      "url": "https://dchub.cloud/mcp"
    }
  }
}
VS Code (.vscode/mcp.json)
{
  "servers": {
    "dc-hub": {
      "type": "http",
      "url": "https://dchub.cloud/mcp"
    }
  }
}

Questions

What does DC Hub do?

Orchestration layer for data center and energy intelligence. Start with execute_plan. It exposes 80 tools to AI assistants.

What tools does DC Hub provide?

80 tools, including execute_plan, get_api_key, search, fetch, search_facilities, get_facility, get_market_intel, get_market_dcpi_rank, predict_market_trajectory, get_gas_index, get_gas_economics, get_grid_scoreboard….

How do I connect DC Hub to Claude, ChatGPT or Cursor?

Add the remote MCP endpoint https://dchub.cloud/mcp as a custom connector or MCP server. Copy-paste setup is on this page.

Does DC Hub require an account or API key?

No sign-in was needed to list its tools. Individual tools may still need an account or API key.

Is DC Hub online?

As of 2026-11-19 our probe found it online. It answered 100% of our last 3 checks.

Who publishes DC Hub?

dchub.cloud. The official MCP Registry verified that the publisher controls this domain before accepting the listing.

Similar in Web Search & Scraping