{"id":"build.exascale/osint","slug":"build-exascale-osint","title":"exascale.build","description":"US ISO interconnection queues and cited energy data. 25 free queries, then $49/mo or $490/yr.","version":"1.1.7","publisher":{"kind":"domain","id":"exascale.build","label":"exascale.build","url":"https://exascale.build"},"website":"https://exascale.build","repository":"","remotes":[{"type":"streamable-http","url":"https://api.exascale.build/mcp"}],"packages":[],"published":"2026-10-05","updated":"2026-10-05","status":"online","auth":"","latency_ms":905,"checked":"2026-11-19","uptime":100,"checks":3,"tools":[{"name":"list_capabilities_v1","title":"List Capabilities","description":"List available exascale.build data capabilities for agent discovery before querying. Also call this BEFORE stating that a capability is not available — client tool lists are cached and this surface grows; anything listed here is reachable via query_capability_v1 even if your tool list predates it.","read_only":true},{"name":"get_source_evidence_v1","title":"Get Source Evidence","description":"Fetch and hash-verify the raw source row behind a returned citation.\n\nPass a citation object inside `params`. Two ready-to-pass shapes come straight from\nthe query tools: each aggregate row's `citations[ref].verify` object, or a detail\nrecord's `citation` (from include_records). Either proves the number with no\nre-query. The tool verifies the raw workbook SHA-256 before returning source-header\nrow","read_only":true},{"name":"describe_capability_v1","title":"Describe Capability","description":"Describe any served capability by name — the generic twin of the named describe tools.\n\nPass `capability` as either a capability id from list_capabilities_v1 (e.g. \"power.capacity\")\nor a query primitive name (e.g. \"query_power_capacity_v1\"). Returns the same schema payload\nas the named describe tool: valid filters, groupings, metrics, detail fields, and citation\nfields. Use the generic pair (this ","read_only":true},{"name":"query_capability_v1","title":"Query Capability","description":"Query any served capability by name — the generic twin of the named query tools, reaching every capability including ones newer than your client's cached tool list.\n\nPass `capability` as either a capability id from list_capabilities_v1 (e.g. \"power.price_ercot\")\nor a query primitive name (e.g. \"query_power_price_ercot_v1\"), and `params` as the same flat\nJSON object the named query tool accepts — c","read_only":true},{"name":"describe_power_capacity_v1","title":"Describe Power Capacity","description":"Describe valid filters, groupings, metrics, detail fields, and citation fields for power.capacity.","read_only":true},{"name":"query_power_capacity_v1","title":"Query Power Capacity","description":"Query verified U.S. generator-level operating, planned, retired, or canceled power capacity from EIA-860M.\n\nUse this for capacity questions by state/jurisdiction, county FIPS,\nsource-reported balancing authority code, fuel, prime mover, technology,\nlifecycle, or year. Pass filters inside the `params` object. The\noperating/planned/retired/canceled selector is `lifecycle` (e.g.\n`lifecycle: \"operatin","read_only":true},{"name":"describe_power_generation_v1","title":"Describe Power Generation","description":"Describe valid filters, groupings, atoms, metrics, detail fields, and citation fields for power.generation.","read_only":true},{"name":"query_power_generation_v1","title":"Query Power Generation","description":"Query verified U.S. monthly net electricity generation (MWh) from EIA-923.\n\nUse this for \"how much was generated\" questions by state, source-reported balancing\nauthority code, fuel, prime mover, sector, plant, or generator, for a given month.\nFor a fuel total or a fuel mix (e.g. \"coal generation\", \"top fuels\"), filter or group\nby `fuel_group` — it sums the several energy_source_code values a fuel ","read_only":true},{"name":"describe_power_asset_ownership_v1","title":"Describe Power Asset Ownership","description":"Describe annual EIA-860 ownership filters, convention, metrics, and exact-cell citations.","read_only":true},{"name":"query_power_asset_ownership_v1","title":"Query Power Asset Ownership","description":"Query verified annual EIA-860 generator ownership.\n\nReturns the Owner schedule's raw owner names and ownership shares for each\n`eia_plant_id` + `generator_id`. `percent_owned` is the workbook's raw fraction of\none (0.6 = 60%), not a whole-number percent. Filter by plant, generator, exact raw\nowner name, state, owner state, annual vintage, or source-reported balancing\nauthority code; `{\"state\":\"TX\"","read_only":true},{"name":"describe_power_fuel_cost_v1","title":"Describe Power Fuel Receipts and Costs","description":"Describe EIA-923 receipt/cost filters, raw units, missing semantics, and exact-cell citations.","read_only":true},{"name":"query_power_fuel_cost_v1","title":"Query Power Fuel Receipts and Costs","description":"Query verified raw EIA-923 fuel receipts and delivered fuel costs.\n\nReturns one Page 5 Fuel Receipts and Costs row per published receipt: plant/month,\nfuel, supplier, purchase type, source physical quantity, and delivered cost in\nEIA's stated cents/MMBtu. Filter by plant, month/range, exact source strings, state,\nfuel, cost status, or source-reported balancing authority code;\n`{\"state\":\"TX\",\"balan","read_only":true},{"name":"describe_power_plant_costs_v1","title":"Describe FERC Form 1 Plant Costs","description":"Describe native-XBRL Form 1 plant-cost facts, units, coverage, and exact-fact citations.","read_only":true},{"name":"query_power_plant_costs_v1","title":"Query FERC Form 1 Plant Costs","description":"Query accepted native-XBRL FERC Form 1 large-steam plant facts.\n\nReturns one separately cited XBRL fact per respondent, report year, raw plant name,\nand source concept: installed capacity, net generation, plant-cost balance items,\nfuel expense, and individual operation and maintenance lines. Values and units are\nas filed; nominal dollars are not adjusted, allocated, divided by generation, or\ncombi","read_only":true},{"name":"describe_natural_gas_prices_v1","title":"Describe Natural Gas Prices","description":"Describe the EIA Henry Hub and state electric-power gas-price atoms, units, aggregate grain, missingness, vintages, and citations.","read_only":true},{"name":"query_natural_gas_prices_v1","title":"Query Natural Gas Prices","description":"Query verified EIA natural-gas price records from two public series.\n\n`atom=\"henry_hub_daily_spot\"` returns one trading-day Henry Hub spot price in\nEIA's published $/MMBtu unit (series RNGWHHD). `atom=\"state_electric_power_monthly\"`\nreturns one state-month average price paid by electric-power consumers in EIA's\npublished $/Mcf unit; `{\"atom\":\"state_electric_power_monthly\",\"state\":\"TX\"}` is\nthe Tex","read_only":true},{"name":"describe_power_demand_v1","title":"Describe Power Demand","description":"Describe valid filters, groupings, metrics, detail fields, and citation fields for power.demand.","read_only":true},{"name":"query_power_demand_v1","title":"Query Power Demand","description":"Query verified U.S. hourly electricity demand (MW) by balancing authority from EIA-930.\n\nUse this for \"how much load\" questions at the hourly balancing-authority grain:\nfilter or group by `balancing_authority_code`, `region`, `data_date` (or the\n`data_date_from`/`data_date_to` range), `hour_number`, `datetime_utc`, or\n`is_imputed`. Pass filters inside the `params` object. Returns JSON aggregates\nw","read_only":true},{"name":"describe_power_demand_rollup_v1","title":"Describe Power Demand (national / region rollup)","description":"Describe valid filters, groupings, metrics, detail fields, and citation fields for power.demand_rollup.","read_only":true},{"name":"query_power_demand_rollup_v1","title":"Query Power Demand (national / region rollup)","description":"Query verified U.S. hourly electricity demand (MW) as EIA's own published national and regional totals from the EIA Grid Monitor (region-data).\n\nUse this for \"how much load for the whole country, or a region\" questions. Filter by\n`respondent` (US48 = the Lower-48 national total, or one of the 13 EIA regions — CAL, CAR,\nCENT, FLA, MIDA, MIDW, NE, NW, NY, SE, SW, TEN, TEX), `data_date` (one day) or ","read_only":true},{"name":"describe_power_retail_sales_v1","title":"Describe Power Retail Sales","description":"Describe valid filters, groupings, metrics, detail fields, and citation fields for power.retail_sales.","read_only":true},{"name":"query_power_retail_sales_v1","title":"Query Power Retail Sales","description":"Query verified U.S. annual retail electricity sales — billed MWh, revenue, and customer counts — by utility, state, and customer sector from EIA-861.\n\nUse this for \"who sold how much power to whom\" questions at the annual\nutility×state×sector grain: filter or group by `data_year`, `state`, `sector`\n(residential / commercial / industrial / transportation), `part`,\n`service_type`, `ownership`, `ba_c","read_only":true},{"name":"describe_power_interconnection_queue_v1","title":"Describe Power Interconnection Queue (MISO)","description":"Describe valid filters, groupings, metrics, detail fields, and citation fields for power.interconnection_queue.","read_only":true},{"name":"query_power_interconnection_queue_v1","title":"Query Power Interconnection Queue (MISO)","description":"Query the MISO generator interconnection queue — the public waiting line of projects that have REQUESTED to connect to the MISO grid (the 15-state Midwest/South footprint).\n\nReturns cited, project-level records: requested megawatts (net summer / net winter), location\n(`state`, `county`, derived `county_fips`), fuel and technology as MISO reports them, three\nindependent status dimensions (`applicat","read_only":true},{"name":"describe_power_interconnection_queue_pjm_v1","title":"Describe Power Interconnection Queue (PJM)","description":"Describe valid filters, groupings, metrics, detail fields, and citation fields for power.interconnection_queue_pjm.","read_only":true},{"name":"query_power_interconnection_queue_pjm_v1","title":"Query Power Interconnection Queue (PJM)","description":"Query the PJM New Services (interconnection) queue — the public waiting line of projects that have REQUESTED to connect to the PJM grid (the mid-Atlantic RTO incl. Northern Virginia, PA, NJ, MD, OH, VA, WV and more).\n\nReturns cited, project-level records with PJM's full published structure: requested megawatts\n(`requested_max_output_mw` = MFO, `requested_summer_mw` = MW Capacity / summer net,\n`req","read_only":true},{"name":"describe_power_interconnection_queue_pjm_cycle_v1","title":"Describe Power Interconnection Queue (PJM cluster/cycle)","description":"Describe valid filters, groupings, metrics, detail fields, and citation fields for power.interconnection_queue_pjm_cycle.","read_only":true},{"name":"query_power_interconnection_queue_pjm_cycle_v1","title":"Query Power Interconnection Queue (PJM cluster/cycle)","description":"Query PJM's cluster/cycle service-request grid — the cluster view of PJM's interconnection process: the TC1/TC2 transition cycles (re-processing the pre-Order-2023 serial backlog) and the reopened steady-state cycles (C01+, the new intake). A SEPARATE PJM publication from the full New Services queue (query_power_interconnection_queue_pjm_v1) — richer per-project cluster detail; the two share rows ","read_only":true},{"name":"describe_power_interconnection_queue_caiso_v1","title":"Describe Power Interconnection Queue (CAISO)","description":"Describe valid filters, groupings, metrics, detail fields, and citation fields for power.interconnection_queue_caiso.","read_only":true},{"name":"query_power_interconnection_queue_caiso_v1","title":"Query Power Interconnection Queue (CAISO)","description":"Query the CAISO generator interconnection queue — California ISO's public Public Queue Report, the waiting line of projects that have REQUESTED to connect to the CAISO grid (California, plus the out-of-state edges it studies: NV, AZ).\n\nReturns cited, project-level records with CAISO's full published structure: the net megawatts to grid (`net_mw_to_grid`, CAISO's own headline figure) and the per-co","read_only":true},{"name":"describe_power_interconnection_queue_nyiso_v1","title":"Describe Power Interconnection Queue (NYISO)","description":"Describe valid filters, groupings, metrics, detail fields, and citation fields for power.interconnection_queue_nyiso.","read_only":true},{"name":"query_power_interconnection_queue_nyiso_v1","title":"Query Power Interconnection Queue (NYISO)","description":"Query the NYISO generator + load interconnection queue — New York ISO's public waiting line of projects that have REQUESTED to connect to the New York grid. Uniquely among ISOs, NYISO publishes a Load Projects tab — load interconnection requests (large-load demand), served as-reported — and since its 2026-07 edition tags each load request with its own `End-Use` class (`end_use`, e.g. DAT / DAT-AI ","read_only":true},{"name":"describe_power_interconnection_queue_isone_v1","title":"Describe Power Interconnection Queue (ISO-NE)","description":"Describe valid filters, groupings, metrics, detail fields, and citation fields for power.interconnection_queue_isone.","read_only":true},{"name":"query_power_interconnection_queue_isone_v1","title":"Query Power Interconnection Queue (ISO-NE)","description":"Query the ISO-NE generator interconnection queue — ISO New England's public IRTT \"public queue\" report, the waiting line of projects that have REQUESTED to connect to the New England grid (CT, MA, ME, NH, RI, VT).\n\nReturns cited, project-level records with ISO-NE's full published structure (all 31 columns of the rendered report): the three megawatt readings kept SEPARATE (`net_mw`, `summer_mw` = m","read_only":true},{"name":"describe_power_interconnection_queue_ercot_v1","title":"Describe Power Interconnection Queue (ERCOT)","description":"Describe valid filters, groupings, metrics, detail fields, and citation fields for power.interconnection_queue_ercot.","read_only":true},{"name":"query_power_interconnection_queue_ercot_v1","title":"Query Power Interconnection Queue (ERCOT)","description":"Query the ERCOT generator interconnection queue — ERCOT's public GIS Report (EMIL PG7-200-ER), the waiting line of generation projects that have REQUESTED to connect to the ERCOT (Texas) grid.\n\nReturns cited, project-level records with ERCOT's full published structure across four lifecycle sheets (Large Gen + Small Gen = active; Inactive Projects; Cancellation Update): the requested `capacity_mw` ","read_only":true},{"name":"describe_power_interconnection_queue_spp_v1","title":"Describe Power Interconnection Queue (SPP)","description":"Describe valid filters, groupings, metrics, detail fields, and citation fields for power.interconnection_queue_spp.","read_only":true},{"name":"query_power_interconnection_queue_spp_v1","title":"Query Power Interconnection Queue (SPP)","description":"Query the SPP generator interconnection queue — Southwest Power Pool's public GI Summary report, the waiting line of generation projects that have REQUESTED to connect to the SPP grid (the ~14-state central-US RTO: OK, KS, TX panhandle, NE, NM, MO, CO, ND, SD, AR, LA and more).\n\nReturns cited, project-level records with SPP's full published structure: the requested `capacity_mw` (SPP's headline `C","read_only":true},{"name":"describe_power_price_ercot_v1","title":"Describe Power Prices (ERCOT day-ahead)","description":"Describe valid filters, groupings, metrics, detail fields, and citation fields for power.price_ercot.","read_only":true},{"name":"query_power_price_ercot_v1","title":"Query Power Prices (ERCOT day-ahead)","description":"Query verified ERCOT wholesale electricity prices — ERCOT's Day-Ahead Market Settlement Point Prices ($/MWh, EMIL NP4-190-CD), the price cleared the day before each operating day at every ERCOT (Texas) settlement point, served hourly.\n\nReturns cited prices for each (`settlement_point`, `delivery_date`, `hour_ending`): the per-hour `price_usd_per_mwh` in detail records, plus `avg_price_usd_per_mwh`","read_only":true},{"name":"describe_power_capacity_accreditation_pjm_v1","title":"Describe PJM ELCC Class Ratings (internal)","description":"Describe PJM ELCC document identities, class dimensions, metrics, and citations.","read_only":true},{"name":"query_power_capacity_accreditation_pjm_v1","title":"Query PJM ELCC Class Ratings (internal)","description":"Query cited PJM marginal ELCC class ratings by document kind, auction, delivery year, and resource class. Preliminary, final, and incremental-auction documents remain separate; no value is preferred or reconciled. Requires an API key ($49/mo or $490/yr, 7-day full refund, at https://exascale.build/pro) while the source's redistribution terms are under review. This data point is not included in the","read_only":true},{"name":"describe_power_capacity_market_pjm_v1","title":"Describe PJM RPM Capacity-Market Results (internal)","description":"Describe PJM RPM delivery-year/LDA filters, UCAP metrics, and citations.","read_only":true},{"name":"query_power_capacity_market_pjm_v1","title":"Query PJM RPM Capacity-Market Results (internal)","description":"Query cited PJM Base Residual Auction UCAP clearing prices, RTO cleared MW, reliability requirement, and published administrative price collar by delivery year and LDA. Requires an API key ($49/mo or $490/yr, 7-day full refund, at https://exascale.build/pro) while the source's redistribution terms are under review. This data point is not included in the 25 free queries.","read_only":true},{"name":"describe_power_capacity_accreditation_miso_v1","title":"Describe MISO Capacity Accreditation (internal)","description":"Describe MISO accreditation document kinds, resource classes, ratios, suppressions, and citations.","read_only":true},{"name":"query_power_capacity_accreditation_miso_v1","title":"Query MISO Capacity Accreditation (internal)","description":"Query cited MISO Schedule 53 class-average and indicative-DLOL seasonal accreditation ratios, including published unit counts, storage variants, and explicit suppression atoms. Requires an API key ($49/mo or $490/yr, 7-day full refund, at https://exascale.build/pro) while the source's redistribution terms are under review. This data point is not included in the 25 free queries.","read_only":true},{"name":"describe_power_capacity_market_miso_v1","title":"Describe MISO PRA Capacity-Market Results (internal)","description":"Describe MISO PRA planning-year, season, zone, parameter, and citation fields.","read_only":true},{"name":"query_power_capacity_market_miso_v1","title":"Query MISO PRA Capacity-Market Results (internal)","description":"Query cited MISO Planning Resource Auction seasonal zonal ACP, verbatim ERZ values, published CONE parameters, and IMM conduct thresholds. Requires an API key ($49/mo or $490/yr, 7-day full refund, at https://exascale.build/pro) while the source's redistribution terms are under review. This data point is not included in the 25 free queries.","read_only":true},{"name":"describe_ai_infrastructure_construction_v1","title":"Describe AI Infrastructure Construction (data centers + fabs)","description":"Describe valid filters, groupings, metrics, detail fields, and citation fields for ai_infrastructure.construction.","read_only":true},{"name":"query_ai_infrastructure_construction_v1","title":"Query AI Infrastructure Construction (data centers + fabs)","description":"Query verified U.S. private construction spending ($ millions) for data centers and semiconductor/computer-electronics manufacturing plants, from the U.S. Census Bureau's Value of Construction Put in Place (C30).\n\nUse this for \"how much is being spent BUILDING data centers (or chip fabs) in the US\" questions —\nthe construction buildout in dollars, not capacity or investment. Filter by `category`\n(","read_only":true},{"name":"describe_ai_infrastructure_trade_v1","title":"Describe AI Infrastructure Trade (chip imports)","description":"Describe valid filters, groupings, metrics, detail fields, and citation fields for ai_infrastructure.trade.","read_only":true},{"name":"query_ai_infrastructure_trade_v1","title":"Query AI Infrastructure Trade (chip imports)","description":"Query verified U.S. monthly IMPORTS of integrated circuits (HS-8542) — customs value (USD) by country of origin — from the U.S. Census Bureau's International Trade data.\n\nUse this for \"how much $ of chips did the US import (from Taiwan / South Korea / in total) and how is it trending\" questions. HS-8542 is ALL integrated circuits (processors, memory, amplifiers, parts) — NOT AI-accelerator / GPU-s","read_only":true},{"name":"describe_ai_infrastructure_equipment_trade_v1","title":"Describe AI Infrastructure Equipment Trade (chip-making tools)","description":"Describe valid filters, groupings, metrics, detail fields, and citation fields for ai_infrastructure.equipment_trade.","read_only":true},{"name":"query_ai_infrastructure_equipment_trade_v1","title":"Query AI Infrastructure Equipment Trade (chip-making tools)","description":"Query verified U.S. monthly IMPORTS of semiconductor-manufacturing EQUIPMENT (HS-8486) — customs value (USD) by country of origin — from the U.S. Census Bureau's International Trade data.\n\nUse this for \"is the fab buildout actually tooling up, and who supplies the machines\" questions — the equipment leg of the fab lifecycle: construction spending (ai_infrastructure.construction) measures the shell","read_only":true},{"name":"describe_ai_infrastructure_production_v1","title":"Describe AI Infrastructure Production (semiconductor output and utilization)","description":"Describe valid filters, groupings, metrics, detail fields, and citation fields for ai_infrastructure.production.","read_only":true},{"name":"query_ai_infrastructure_production_v1","title":"Query AI Infrastructure Production (semiconductor output and utilization)","description":"Query verified U.S. semiconductor & electronic-component PRODUCTION and CAPACITY UTILIZATION — the Federal Reserve's monthly G.17 industrial-production index (2017=100) and capacity-utilization rate (percent) for NAICS 3344 — from the Board's own release, history to 1972.\n\nUse this for \"are the domestic fabs actually producing / how hot are they running\" questions — the OUTPUT leg of the fab lifec","read_only":true},{"name":"describe_robotics_trade_v1","title":"Describe Robotics Trade (industrial-robot imports, value + robot counts)","description":"Describe valid filters, groupings, metrics, detail fields, and citation fields for robotics.trade.","read_only":true},{"name":"query_robotics_trade_v1","title":"Query Robotics Trade (industrial-robot imports, value + robot counts)","description":"Query verified U.S. monthly IMPORTS of INDUSTRIAL ROBOTS — customs value (USD) AND unit counts (number of robots) — by country of origin, from the U.S. Census Bureau's International Trade data.\n\nUse this for \"how many robots is the US importing, from whom, and what are they worth\" questions — the only high-frequency official U.S. robotics series. Covers the nomenclature's two robot-specific HS-10 ","read_only":true},{"name":"describe_robotics_adoption_v1","title":"Describe Robotics Adoption (share of plants using robots, workers exposed, robotics capex)","description":"Describe valid filters, groupings, metrics, detail fields, and citation fields for robotics.adoption.","read_only":true},{"name":"query_robotics_adoption_v1","title":"Query Robotics Adoption (share of plants using robots, workers exposed, robotics capex)","description":"Query the verified share of US manufacturing plants USING industrial robots — plus workers exposed and robotics capex — from the Census Industrial Robotic Equipment product (the first official federal robotics-adoption statistics).\n\nUse this for \"are factories actually adopting robots\" questions — the INSTALLED-BASE reading the import data cannot see. Serves the percent of plants with robots and t","read_only":true},{"name":"describe_space_satellite_filings_v1","title":"Describe Space Satellite Filings (FCC satellite licensing docket)","description":"Describe valid filters, groupings, metrics, detail fields, and citation fields for space.satellite_filings.","read_only":true},{"name":"query_space_satellite_filings_v1","title":"Query Space Satellite Filings (FCC satellite licensing docket)","description":"Query the verified FCC satellite licensing docket — every space-station (SAT) filing in the FCC's own daily IBFS database dump, back to the 1960s — by applicant, application type, status, and filing date.\n\nUse this for \"who is authorized to operate what in orbit, what has been filed, and where does each filing stand\" questions — the satellite-buildout licensing pipeline. Each filing carries the FC","read_only":true},{"name":"describe_space_satellite_notices_v1","title":"Describe Space Satellite Notices (FCC weekly satellite public notices)","description":"Describe valid filters, groupings, metrics, detail fields, and citation fields for space.satellite_notices.","read_only":true},{"name":"query_space_satellite_notices_v1","title":"Query Space Satellite Notices (FCC weekly satellite public notices)","description":"Query the FCC Space Bureau's weekly satellite public notices since the ICFS cutover (2025-06-18) — every satellite application the FCC accepted for filing and every action it took (grants, partial grants, dismissals, surrenders), as printed.\n\nUse this for \"what satellite filings has the FCC received or acted on since mid-2025\" questions — the current licensing pipeline, which the pre-cutover docke","read_only":true},{"name":"describe_capacity_factor_v1","title":"Describe Power Capacity Factor","description":"Describe capacity factor: net generation / (operating nameplate × hours), joined across EIA-860M and EIA-923.","read_only":true},{"name":"query_capacity_factor_v1","title":"Query Power Capacity Factor","description":"Query verified U.S. capacity factor — how hard a fleet actually runs — by joining EIA-860M capacity and EIA-923 generation.\n\nRequires `data_month`: one ISO month start, e.g. \"2026-01-01\". If the user names no month, ask which one (or state the month you chose); if a month is not covered, the error lists the months that are — do not retry blindly.\n\ncapacity_factor = net generation (MWh) / (operatin","read_only":true}],"server_info":{"name":"exascale.build","version":"1.0.0"},"category":"data","tags":["cloud","ecommerce","health"],"kind":"remote","source":"registry","submitted":{},"first_party":true,"domain_rank":null,"score":100,"indexable":true,"first_seen":"2026-06-09","stars":0,"badges":[],"sponsor":null,"page":"https://agentsindex.org/agents/build-exascale-osint/"}