{"id":"fr.synergieloc/immobilier","slug":"fr-synergieloc-immobilier","title":"Synergieloc — French real estate & building CAD/BIM","description":"French real-estate law and building CAD/BIM (DXF, IFC). /mcp/v2: lightweight catalogue.","version":"1.2.1","publisher":{"kind":"domain","id":"synergieloc.fr","label":"synergieloc.fr","url":"https://synergieloc.fr"},"website":"https://synergieloc.fr/api-ia","repository":"","remotes":[{"type":"streamable-http","url":"https://synergieloc.fr/mcp","headers":[{"description":"Bearer slk_live_… — optional to connect. tools/list and the guides_liste, guide_lire, obtenir_cle_api tools work with no key at all; call obtenir_cle_api first to get one instantly (no email, no signup form) for the paid tools.","isSecret":true,"name":"Authorization"}]},{"type":"streamable-http","url":"https://synergieloc.fr/mcp/v2","headers":[{"description":"Bearer slk_live_… — optional to connect. tools/list and the guides_liste, guide_lire, obtenir_cle_api tools work with no key at all; call obtenir_cle_api first to get one instantly (no email, no signup form) for the paid tools.","isSecret":true,"name":"Authorization"}]}],"packages":[],"published":"2026-11-16","updated":"2026-11-16","status":"online","auth":"","latency_ms":1301,"checked":"2026-11-19","uptime":100,"checks":3,"tools":[{"name":"cao_bim_conformite","title":"Assess BIM compliance of a building scene","description":"Appelez quand vous devez etablir le bilan BIM consolide d'une scene CAO (LOD/LOI, completude, conformite, nommage, disciplines, quantitatif) pour une phase donnee. Renvoie un score 0-100, le verdict et les ecarts, sans modifier la scene. Phase : esquisse | aps | apd | dce | execution (defaut apd).","read_only":true},{"name":"cao_bim_aller_retour","title":"Verify a lossless IFC round-trip of a building scene","description":"Appelez quand vous devez verifier l'aller-retour IFC complet d'une scene CAO : exporte en IFC4 (ifcopenshell), reimporte et compare semantiquement. Garantit qu'aucun element n'est perdu ni deplace de niveau ; signale les ajouts (toiture/plancher deduits) et les ecarts de fidelite (cotes, materiaux). Renvoie {ok, elements_avant, elements_apres, pertes, ajouts, avertissements, ifc_octets}. Sans modi","read_only":true},{"name":"cao_bim_disciplines","title":"Assign elements to disciplines and show the coordination matrix","description":"Appelez quand vous devez attribuer chaque element d'une scene CAO a sa discipline (architecture, structure, MEP, electricite, plomberie, CVC, paysage, voirie), donne l'effectif par discipline et la matrice de coordination (paires de metiers a faire dialoguer). Lecture seule, sans modifier la scene.","read_only":true},{"name":"cao_bim_modele","title":"Build the semantic BIM model of a building scene","description":"Appelez quand vous devez construire le modele semantique BIM d'une scene CAO (identifiants stables, niveau, dimensions, materiau, libelle) et verifie l'aller-retour JSON sans perte. Lecture seule, sans modifier la scene.","read_only":true},{"name":"cao_bim_familles","title":"List or author parametric building families (standard, manufacturer types, data-defined)","description":"Appelez quand vous devez lister les familles parametriques standard (action=standard, defaut), lister les familles data-driven avec catalogue de types fabricants (action=parametrique), evaluer une famille definie en donnees avec formules texte (action=evaluer, definition={...}, valeurs={...}) ou instancier un type fabricant (action=type, famille=..., type=...). Lecture seule.","read_only":true},{"name":"cao_bim_doe","title":"Produce the DOE fine documentation (room sheets, finish schedules, DOE manifest)","description":"Appelez quand vous devez produire la documentation fine de fin de chantier (DOE) : fiches de local (action=fiches, defaut), nomenclature des finitions avec totaux par materiau (action=finitions) ou sommaire DOE present/manquant (action=doe). Entree : scene CAO + finitions declarees {piece:{sol,mur,plafond}}. Lecture seule.","read_only":true},{"name":"cao_bim_federation","title":"Federate multiple models of a large project (worksharing, central sync, clash detection)","description":"Appelez quand vous devez federer plusieurs modeles ou batiments d'un grand projet (worksharing) : relie chaque modele a sa discipline, detecte les elements dupliques et les collisions de noms, synchronise les reservations dans un registre central, ou differe deux etats pour reperer les changements concurrents (action=diff, etat_a/etat_b). Entree : scenes=[{nom, discipline, scene}] ou modeles={nom:","read_only":true},{"name":"cao_bim_fabricants","title":"Browse, import and export the manufacturer family catalog (joinery, sanitary, HVAC, electrical, structure)","description":"Appelez quand vous devez consulter ou etendre le catalogue de familles fabricants (menuiseries, sanitaires, chauffage, ventilation, electricite, structure, cloison_isolation) : stats (action=stats, defaut), recherche (action=rechercher), evaluer un type (action=instancier), selectionner par criteres (action=selectionner), dump (action=catalogue), valider/importer des familles (action=importer, ent","read_only":true},{"name":"cao_bim_dtu","title":"Check a scene against French execution standards (DTU)","description":"Appelez quand vous devez verifier la conformite d'une scene aux normes d'execution francaises (DTU) : epaisseurs des murs cloison/porteur (DTU 20.1), alleges et appuis des fenetres (DTU 36.5), garde-corps (NF P01-012), pentes de couverture selon le materiau (DTU 40.35), pentes d'evacuation (DTU 60.11) et ventilation des pieces humides (DTU 68.3). Rend chaque ecart avec SA norme, son article et le ","read_only":true},{"name":"cao_bim_sismique","title":"Pre-dimension a building for earthquake (Eurocode 8, indicative)","description":"Appelez quand vous devez predimensionner un batiment au seisme (Eurocode 8, indicatif) : zonage sismique FR (1-5), spectre de reponse elastique, periode T1, effort tranchant a la base par la methode des forces laterales et sa repartition par niveau, avec la masse estimee depuis la scene (ou niveaux explicites). Indicatif — la note sismique signee reste au bureau d'etudes. Lecture seule.","read_only":true},{"name":"cao_bim_options","title":"Compare design options (A/B variants) by quantities, cost and schedule","description":"Appelez quand vous devez comparer des options de conception (variantes A/B) d'un projet : chaque variante est une scene nommee, et la comparaison est CALCULEE (quantitatif, cout 5D, delai 4D pondere par la surface). action=comparer (defaut) rend les evaluations, les ecarts et la meilleure par critere ; action=choisir rend la variante gagnante selon critere=cout|surface|delai. Lecture seule.","read_only":true},{"name":"cao_bim_terrain","title":"Analyze terrain points (slope, cut/fill volumes, balanced platform)","description":"Appelez quand vous devez analyser un terrain et son terrassement depuis des points topographiques : pente moyenne et maximale (plan ajuste), volumes de deblai/remblai pour une plateforme, altitude qui equilibre deblai=remblai, et conseils (pente forte, drainage). action=verifier (defaut) | pente | volumes | equilibre. points=[{x, y, z}] en metres. Indicatif (topographie reelle = geometre). Lecture","read_only":true},{"name":"cao_bim_cctp","title":"Draft the technical specifications (CCTP) per construction lot","description":"Appelez quand vous devez rediger le CCTP (cahier des clauses techniques particulieres) d'une scene : les 11 lots du marche (gros oeuvre, charpente, menuiseries, platerie, electricite, plomberie, chauffage, sols, peinture...) avec leurs clauses produits/mise en oeuvre, leurs normes DTU/NF et le quantitatif de la scene rattache. lot=code (00-10) rend la note d'un lot seul. Lecture seule.","read_only":true},{"name":"cao_bim_reception","title":"Produce the snag list (reserves) and handover report (PV de reception)","description":"Appelez quand vous devez produire les reserves et le PV de reception d'une scene : les ecarts DTU deviennent des reserves numerotees rattachees a leur lot, les reserves se levent avec preuve (levee_ids + acteur + date), et la reception DECIDE (sans reserve / avec reserves / refusee) avec les garanties legales (parfait achevement, biennale, decennale). Lecture seule.","read_only":true},{"name":"cao_bim_portfolio","title":"Consolidate multiple BIM projects into a portfolio (design office view)","description":"Appelez quand vous devez consolider PLUSIEURS projets BIM en un portefeuille (vue bureau d'etudes) : statistiques (score moyen, cout total, prets/bloques, a signer), lignes par projet et classement (les bloques en tete). Entree : scenes=[{nom, scene}] (dossiers construits automatiquement) ou projets=[{nom, dossier}]. Lecture seule.","read_only":true},{"name":"cao_bim_maintenance","title":"Produce the maintenance logbook (periodicities and legal obligations per equipment)","description":"Appelez quand vous devez produire le carnet d'entretien (exploitation) d'une scene : chaque equipement (chaudiere, PAC, VMC, chauffe-eau, climatiseur, ascenseur...) recoit sa periodicite d'entretien et ses OBLIGATIONS legales (chaudiere annuelle, PAC tous les 2 ans...). Les fabricants declares suivent l'equipement. Lecture seule.","read_only":true},{"name":"cao_bim_lod","title":"Evaluate LOD/LOI of building elements against a project phase","description":"Appelez quand vous devez evaluer le niveau de developpement (LOD) et d'information (LOI) de chaque element d'une scene CAO, et le valide contre la phase du projet (esquisse, aps, apd, dce, execution). Rend les exigences par phase, l'evaluation par element et la liste des elements en retard. Lecture seule.","read_only":true},{"name":"cao_bim_cde","title":"Describe the common data environment (CDE) and its workflow","description":"Appelez quand vous devez decrire l'environnement de donnees commun (CDE, ISO 19650) : machine d'etats brouillon -> soumis -> approuve/rejete -> remplace, transitions gardees, et deroule un cycle de vie d'exemple avec piste d'audit et verification des invariants. Lecture seule.","read_only":true},{"name":"cao_bim_livraison","title":"Gate a BIM delivery by LOD/LOI, completeness and compliance","description":"Appelez quand vous devez decider de la livraison BIM (BIM Execution Plan) : verifie que la maquette atteint le LOD/LOI, la completude, le nommage et la conformite exiges par la phase (esquisse/aps/apd/dce/execution). Renvoie {autorise, score, blocages, livrables} ; le manifeste des livrables (IFC, DXF, PDF, carnet, ferraillage, devis, ...) n'est rendu que si la porte passe. Lecture seule.","read_only":true},{"name":"cao_bim_bcf","title":"Generate BCF issues from the IFC round-trip deviations","description":"Appelez quand vous devez generer des issues BCF (BIM Collaboration Format 2.1) depuis les ecarts de l'aller-retour IFC d'une scene (action par defaut : scene + markup XML pret pour Solibri/BIMcollab), depuis les RESERVES de reception (action=reserves : la snag list DTU part en coordination), OU lire un ZIP BCF externe (action=importer, zip_base64). Lecture seule.","read_only":true},{"name":"cao_bim_reglementations","title":"Check a scene against the regulation of the project location","description":"Appelez quand vous devez controler la conformite d'une scene CAO selon la reglementation du TERRAIN du projet (France, Etats-Unis IBC/ADA, Suisse SIA 500, Royaume-Uni Approved Documents). Verifie escaliers, portes, garde-corps et rampes ; renvoie aussi la veille reglementaire (normes referencees + date de mise a jour). Lecture seule.","read_only":true},{"name":"cao_bim_projet","title":"Full project view by terrain: regulation, BIM bilan, gate, deliverables","description":"Appelez quand vous devez obtenir la vue projet complete selon le TERRAIN : reglementation applicable (FR/USA/CH/GB), verdict de conformite, bilan BIM, decision de porte et manifeste des livrables — ou, avec action=dossier, LE DOSSIER BIM COMPLET en un appel (reglementation + bilan + DTU + sismique + cout/planning/courbe en S + note a signer, avec un verdict consolide). Lecture seule.","read_only":true},{"name":"cao_bim_4d5d","title":"Estimate cost (5D) and construction schedule (4D) of a building scene","description":"Appelez quand vous devez estimer le cout (5D) et le planning de construction (4D) d'une scene CAO : quantitatif x taux unitaires, taches filtrees par phase BEP (action=bilan, defaut), la COURBE EN S du cout cumule dans le temps (action=courbe_s, debut=AAAA-MM-JJ) ou la synthese de tresorerie (action=tresorerie). Lecture seule.","read_only":true},{"name":"cao_bim_mep","title":"Check or size MEP systems (network flows, head losses, pump head, electrical panel, ducts)","description":"Appelez quand vous devez verifier ou dimensionner un systeme MEP : connectivite et dimensionnement d'un reseau (action=reseau, defaut), debits cumules calcules d'un reseau hydraulique (action=debits, reseau + demandes), pertes de charge du chemin critique (action=pertes_reseau), hauteur manometrique d'une pompe (action=hmt, denivele_m), tableau electrique (action=tableau), chute de tension NF C 15","read_only":true},{"name":"cao_bim_structure","title":"Estimate structural sizing with simplified EC2 (beam, slab, column, punching)","description":"Appelez quand vous devez obtenir un ordre de grandeur de calcul structure (EC2 simplifie) : poutre, dalle, poteau, effort tranchant, flexion composee, flambement, moment de dalle bidirectionnelle (moment_dalle), poinconnement, dalle complete, voile de contreventement (voile), pieu (pieu), combinaisons de charges EC0 (combinaisons) et tranchant arme (tranchant_arme). Indicatif, pas une note de calc","read_only":true},{"name":"cao_bim_energie","title":"Estimate the U-value and heat loss of building envelope","description":"Appelez quand vous devez estimer la valeur U (W/m2K) d'une paroi composee, les deperditions, le bilan thermique, le Cep, le Bbio — ou l'ETIQUETTE DPE 2021 (A-G) d'un logement : donnez cep_kwh_m2 + ges_kgco2_m2 et le verdict (passoire ou non) sort avec ses conseils. Indicatif, pas une etude RE2020 reglementaire.","read_only":true},{"name":"cao_bim_acv","title":"Compute the embodied carbon (life-cycle) of a building scene","description":"Appelez quand vous devez estimer le CARBONE de la construction (ACV) d'une scene : quantites lues dans la maquette (murs, dalles/planchers, couvertures, menuiseries) x facteurs d'emission FDES/INIES, total et ratio kgCO2e/m2 face aux seuils RE2020 2022/2025/2028/2031. action=acv (defaut) | verifier (verdict indicatif) | suggestions (substitutions et carbone evite). Indicatif — l'etude reglementair","read_only":true},{"name":"cao_bim_incendie","title":"Check fire safety of a building scene (habitation and ERP, indicative)","description":"Appelez quand vous devez verifier la SECURITE INCENDIE d'une scene (habitation ou ERP) : distances d'evacuation (10 m habitation / 40 m ERP, code du travail R. 4216-2), nombre d'issues selon l'effectif (CO 38), unites de passage (CO 36), portes coupe-feu des locaux a risque (CO 24-27), cages d'escalier encloisonnees (CO 52), desenfumage (CO 43), extincteurs (MS 11) et alarme/SSI. type_erp : habita","read_only":true},{"name":"cao_bim_accessibilite","title":"Audit disabled-access (PMR) of a building scene (ERP/housing)","description":"Appelez quand vous devez auditer l'ACCESSIBILITE PMR d'une scene (ERP, bureaux ou habitation ADAP) : portes d'entree >= 0,90 m (0,83 habitation), cheminements >= 1,20 m avec pentes <= 5 % et ressauts <= 2 cm, portes interieures >= 0,80 m, escaliers avec mains courantes et nez contrastes, sanitaire accessible 1,50 x 2,10 m, ascenseur au-dela d'un niveau, 2 % de stationnement adapte et boucle magnet","read_only":true},{"name":"cao_bim_acoustique","title":"Check acoustics of a building scene against the French NRA (indicative)","description":"Appelez quand vous devez verifier l'ACOUSTIQUE d'une scene contre la NRA (arrete 30/06/1999) : bruits aeriens entre logements (DnT,A >= 53 dB), bruits de choc (L'nT,w <= 58 dB), bruits d'equipements (LnAT <= 30/35 dB(A)) et facades (DnT,A,tr >= 30 dB). L'isolement est ESTIME par la loi de masse depuis les couches declarees (materiau + epaisseur_mm) avec la marge des transmissions laterales, et les","read_only":true},{"name":"cao_bim_economie_circulaire","title":"Produce the PEMD waste diagnosis and reuse potential of a scene (indicative)","description":"Appelez quand vous devez produire le diagnostic PEMD (Produits-Equipements-Materiaux-Dechets, loi AGEC / decret PMCB) d'une scene avant demolition ou rehabilitation : masses par materiau, filieres (reemploi / recyclage / valorisation / enfouissement), taux de valorisation face a l'objectif de 70 % (loi LTECV) et potentiel de REEMPLOI des elements demontables (pose mecanique declaree). action=deche","read_only":true},{"name":"cao_bim_eclairage","title":"Check daylight (FLJ) of building rooms from the scene (indicative)","description":"Appelez quand vous devez verifier l'ECLAIRAGE NATUREL (FLJ) d'une scene : surface vitree >= 1/6 de la surface de chaque piece (reglement sanitaire / RE2020) et FLJ estime >= 2 % (EN 17037 / code du travail R. 4223). Le FLJ est calcule depuis la maquette : surface des fenetres assignees aux pieces (pieces[i].fenetres = [indices]), transmission du vitrage (defaut 0,7), facteur de ciel 0,55 reduit pa","read_only":true},{"name":"cao_bim_descente_charges","title":"Run the load takedown of a scene and check the foundations (indicative)","description":"Appelez quand vous devez descendre les charges d'une scene jusqu'au sol et verifier les fondations : poids propres (dalles 25 kN/m3, murs par materiau), charges d'exploitation par usage (EC1-1-1 : habitation 1,5 / bureau 2,5 / commerce 3,5 / stockage 5 kN/m2), combinaison ELU 1,35G + 1,5Q (EC0), puis contrainte transmise par les semelles filantes face a la capacite indicative du sol (sable 0,2 MPa","read_only":true},{"name":"cao_bim_vent","title":"Estimate wind loads on a building scene (Eurocode 1, indicative)","description":"Appelez quand vous devez estimer les CHARGES DE VENT sur un batiment (Eurocode 1-1-4, indicatif) : pression dynamique de pointe qp(z) selon la region (vitesse de base 22-28 m/s) et la categorie de terrain (0-IV), pression sur la facade (cpe simplifie 1,3), force resultante, puis ratio poids/vent >= 1,5 face au poids du batiment (repris de la descente de charges). region 1-4, terrain 0|I|II|III|IV,","read_only":true},{"name":"cao_bim_grue","title":"Choose the site crane and check its lifts from the scene (indicative)","description":"Appelez quand vous devez choisir la GRUE DE CHANTIER et verifier ses levages depuis la maquette : portee couvrant l'emprise + 2 m, chaque levage (masse_kg, position x/y) dans la portee ET dans la courbe de charge (interpolation max -> bout de fleche), et aucun survol des zones interdites (voies, pietons). Catalogue indicatif GME 25 / GTMR 286 / GME 30 / GTMR 331 / GTMR 366. action=verifier (defaut","read_only":true},{"name":"cao_bim_securite_chantier","title":"Check site safety (PPSPS) of a construction scene (indicative)","description":"Appelez quand vous devez verifier la SECURITE DU CHANTIER (PPSPS, indicatif) : protections collectives contre les chutes (garde-corps provisoires/filets sur dalles et toitures en travaux, tremies obturees ou balisees), echafaudages (planchers + amarrages des 2 m, note de calcul au-dela de 12 m), acces aux postes > 3 m (plateforme/echelle crinoline, pas d'escabeau), base vie (vestiaires, WC >= 1/10","read_only":true},{"name":"cao_bim_eaux_pluviales","title":"Size the stormwater retention of a plot from the scene (indicative)","description":"Appelez quand vous devez dimensionner la GESTION DES EAUX PLUVIALES d'une parcelle : surface active (toitures, voiries, espaces verts x coefficients de ruissellement), volume de retention requis par la methode des pluies simplifiee (pluie de reference, debit de fuite autorise — souvent 3 L/s/ha en PLU), verification du volume et du debit declares, et incitation a l'infiltration (toiture vegetalise","read_only":true},{"name":"cao_bim_biotope","title":"Check the biodiversity coefficient (CBS) of a plot from the scene (indicative)","description":"Appelez quand vous devez verifier la BIODIVERSITE d'une parcelle (coefficient de biotope du PLU) : CBS = somme(surfaces eco-amenageables x coefficient) / parcelle, avec pleine terre 1,0 / espaces verts sur dalle 0,7 / toiture vegetalisee 0,5 / paves drainants 0,3 ; controle contre le seuil (defaut 0,2), la pleine terre >= 20 % de la parcelle, 1 arbre par 150 m2 et la presence de revetements draina","read_only":true},{"name":"cao_bim_confort_ete","title":"Check summer comfort (overheating risk) of a scene (RE2020 levers, indicative)","description":"Appelez quand vous devez verifier le CONFORT D'ETE (surchauffe, RE2020) d'une scene : protections solaires sur les baies sud/ouest >= 1 m2 (bso/casquette/volet declares), inertie (dalle beton >= 12 cm), ventilation nocturne (ouvrants >= 4 % des pieces exposees) et ratio de vitrage sud+ouest <= 30 % de la surface habitable. Rend le RISQUE de surchauffe (faible/modele eleve). ouvertures [{orientatio","read_only":true},{"name":"cao_bim_geotechnique","title":"Choose the foundation system of a scene from loads and soil (indicative)","description":"Appelez quand vous devez choisir le SYSTEME DE FONDATION d'un batiment : la descente de charges (N ELU, murs porteurs) est confrontee au sol (capacite admissible, argile, remblai) et le systeme est recommande — semelles filantes, semelles elargies (largeur calculee), radier general (ratio > 1,5 ou remblai) ou pieux (remblai epais) — avec la profondeur d'assise (hors gel >= 50 cm, >= 80 cm en argil","read_only":true},{"name":"cao_bim_etancheite","title":"Check airtightness (Q4Pa-surf) of a building scene (RE2020, indicative)","description":"Appelez quand vous devez verifier l'ETANCHEITE A L'AIR (RE2020) d'un batiment : Q4Pa-surf <= 0,6 m3/(h.m2) maison / 1,0 collectif, points singuliers traites (menuiseries, traversees, trappes, gaines, conduits — membrane/mastic/joint), membrane pare-vapeur continue (maison) et test a la porte soufflante par un operateur autorise. scene : q4_m3h_m2, points_singuliers [{type, traite}], membrane_pare_","read_only":true},{"name":"cao_bim_ratios","title":"Consolidate the design dashboard (CES, compactness, glazing, cost/m2, carbon/m2) of a scene","description":"Appelez quand vous voulez le TABLEAU DE BORD DE CONCEPTION d'une scene : SHAB, emprise et CES (emprise/parcelle <= 0,40), hauteur, surface deperditive et compacite (<= 1,2), ratio de vitrage (entre 1/6 et 30 %), cout/m2 (5D mercuriale BT, ou cout_total_eur declare) et carbone kgCO2e/m2 (ACV, <= 800). Les seuils se surchargent : seuils = {ces, compacite, vitrage_min, vitrage_max, cout_max_m2, cout_","read_only":true},{"name":"cao_bim_worksharing","title":"Multi-actor sessions on a shared scene: locks, conflicts, auto-merge","description":"Appelez quand PLUSIEURS acteurs doivent travailler sur la MEME maquette (worksharing) : creer une session (jeton + version), joindre, verrouiller/deverrouiller des elements, modifier avec detection des conflits (une modification basee sur une version perimee d'un element deja retouche est SIGNALEE, pas ecrasee ; les modifications sur des elements disjoints se FUSIONNENT automatiquement), synchroni","read_only":true},{"name":"cao_bim_placer","title":"Place manufacturer catalog types into the scene (authoring) and schedule them","description":"Appelez quand vous devez POSER un type du catalogue fabricants DANS la maquette (auteur) : placer(scene, famille, type, x/y/z) ajoute l'element dans le bon conteneur (ouvertures, murs, boites, poteaux, poutres, escaliers, equipements), valide les dimensions contre les bornes du type, et l'instance porte famille/type/fabricant/reference — repris tels quels dans le Pset IFC a l'export. action=placer","read_only":true},{"name":"cao_bim_exe","title":"Produce the multi-lot execution package (EXE) of a scene (indicative)","description":"Appelez quand vous devez produire le DOSSIER EXE MULTI-LOTS d'une scene : decoupage en 9 lots d'execution (gros oeuvre, charpente/couverture, menuiseries, cloisons, electricite, plomberie, CVC, sols, peinture) avec elements, quantites (ml/m2/unites), normes DTU/NF, points de controle et tolerances — plus la verification (conteneurs hors lots, gros oeuvre manquant, menuiseries sans fabricant) et ac","read_only":true},{"name":"cao_bim_mep_dimensionnement","title":"Size water and air duct diameters of a MEP network (velocity method, indicative)","description":"Appelez quand vous devez DIMENSIONNER LES DIAMETRES d'un reseau MEP : chaque troncon d'eau recoit le DN standard (12->110) par la methode des vitesses (0,4-1,5 m/s confort, 2,5 m/s limite) sur son debit cumule aval, avec la perte de charge Hazen-Williams ; les gaines aerauliques sont dimensionnees (<= 4 m/s, tailles standard 100->500 mm). action=reseau (defaut : dimensionner) | verifier (diametres","read_only":true},{"name":"cao_bim_bordereau_armatures","title":"Produce the rebar bending schedule (bar shapes, developed length, mass) of a scene","description":"Appelez quand vous devez produire le BORDEREAU D'ARMATURES (livrable ferrailleur) d'une scene : les barres declarees (element + barres [{diametre_mm, forme: droit|u|cadre|chapeau, quantite, dims}]) recoivent leur DEVELOPPE (NF A 35-027 : crochets 6d/10d) et leur MASSE (d2 x 0,006165 kg/m), groupees par element/diametre/forme, avec total acier, beton de la scene et densite kg/m3 (alerte hors 30-250","read_only":true},{"name":"cao_bim_planning_cpm","title":"Schedule a construction with the critical path method (4D, indicative)","description":"Appelez quand vous devez ordonnancer le chantier par la METHODE DU CHEMIN CRITIQUE (4D avance) : debut/fin au plus tot et au plus tard (ES/EF/LS/LF), marges, chemin critique (taches a marge nulle), detection des cycles de dependances, date de fin calculee depuis le debut et RETARD face a une date limite contractuelle. taches = [{nom, duree_jours, dependances, jalon?}] ou scene.taches_personnalisee","read_only":true},{"name":"cao_bim_dossier_complet","title":"Produce the complete DCE package (all BIM pieces) of a scene in one call","description":"Appelez quand vous voulez LE DOSSIER DCE COMPLET en un appel : le dossier historique (reglementation, bilan, gate, DTU, sismique, cout, planning, courbe en S, CCTP, terrain, note) PLUS toutes les pieces ajoutees — ACV carbone, securite incendie, accessibilite PMR, acoustique NRA, economie circulaire PEMD, eclairage FLJ, confort d'ete, etancheite a l'air, EXE multi-lots, geotechnique, ratios de con","read_only":true},{"name":"cao_bim_assurances","title":"Check the mandatory construction insurances (DO, decennale, RC pro, display) of a scene","description":"Appelez quand vous devez verifier les ASSURANCES OBLIGATOIRES de la construction : dommages-ouvrage souscrite AVANT l'ouverture du chantier (code des assurances L. 242-1), garantie decennale et RC pro de CHAQUE entreprise par lot (L. 241-1, loi Spinetta), permis affiche, panneau de chantier et declaration d'ouverture de chantier (urbanisme R. 424-15/16). scene : debut, assurances {dommages_ouvrage","read_only":true},{"name":"cao_bim_cvc","title":"Size the HVAC generator (heating power + DHW tank) of a scene (indicative)","description":"Appelez quand vous devez dimensionner le GENERATEUR CVC : puissance de chauffage requise (deperditions statiques U.S.dT + marge de relance 1,2), choix du plus petit appareil du catalogue (PAC air/eau 5-16 kW COP 3,2, chaudiere gaz condensation 12-30 kW, fioul 15-25 kW) avec consommation annuelle estimee (1600 h equivalentes / COP ou rendement), ballon ECS >= 50 L/occupant, et verification des puis","read_only":true},{"name":"cao_bim_eclairage_artificiel","title":"Check artificial lighting levels (lux) of rooms against usage requirements (indicative)","description":"Appelez quand vous devez verifier l'ECLAIRAGE ARTIFICIEL d'une scene : chaque piece contre le niveau requis par son usage (code du travail R. 4223-4 / EN 12464 — bureaux 300 lux, circulations 40, stockage 100...), eclairement moyen par la methode des flux (n x flux x 0,7 x 0,8 / surface), nombre de luminaires manquants calcule et densite de puissance <= 8 W/m2. scene : pieces [{nom, surface, type}","read_only":true},{"name":"cao_bim_volumes_eau","title":"Check bathroom electrical safety (NF C 15-100 zones) of a scene (indicative)","description":"Appelez quand vous devez verifier la SECURITE ELECTRIQUE DES SALLES D'EAU (NF C 15-100) : chaque appareil declare est classe dans son volume (0 baignoire/douche IPX7, 1 jusqu'a 2,25 m IPX4, 2 autour 0,60 m IPX2, hors), les prises sont interdites en volumes 0/1 (prise rasoir TBTS toleree en volume 2), les luminaires volumes 0/1 en TBTS 12 V, et la liaison equipotentielle locale + differentiel 30 mA","read_only":true},{"name":"cao_bim_gaz","title":"Check gas installation safety (ventilation, flue, CO detector, valves) of a scene (indicative)","description":"Appelez quand vous devez verifier la SECURITE GAZ d'une installation (arrete 2/08/1977, DTU 61.1) : ventilation du local chaudiere (amenee d'air basse >= 50 cm2 + evacuation haute >= 100 cm2), debouche du conduit >= 40 cm au-dessus du faitage, detecteur de monoxyde de carbone, robinet de coupure generale et robinet de commande par appareil. scene : chauffage/cuisine/equipements [{type: chaudiere_g","read_only":true},{"name":"cao_bim_ascenseur","title":"Check elevators (EN 81 shaft, pit, machine room, safety, accessibility) of a scene (indicative)","description":"Appelez quand vous devez verifier un ASCENSEUR (EN 81, arrete 20/04/2017) : gaine >= dimensions de la capacite (630 kg : 1,50 x 1,50 m ; 1000 kg : 1,90 x 1,90), fosse >= 1,10 m (1,20 pour 800-1000 kg), machinerie ventilee/eclairee, securites (telealarme, eclairage secours, parachute, verrouillage portes palieres) et cabine accessible >= 1,10 x 1,40 m. scene : ascenseurs [{nom, capacite_kg, gaine {","read_only":true},{"name":"cao_bim_qai","title":"Check indoor air quality and ventilation flow rates of a dwelling scene (indicative)","description":"Appelez quand vous devez verifier la QUALITE DE L'AIR et les debits de ventilation d'un logement : debits d'extraction par local selon la taille (arrete 24/03/1982 — cuisine 45->135 m3/h, SDB 15->60, WC 15->30), equilibre soufflage/reprise d'une VMC double flux (+- 10 %), renouvellement d'air des chambres >= 0,6 vol/h (CO2) et entretien VMC planifie. scene : logement {pieces_principales}, ventilat","read_only":true},{"name":"cao_bim_charpente","title":"Size timber roof members (rafters, purlins, EC5) of a scene (indicative)","description":"Appelez quand vous devez dimensionner la CHARPENTE BOIS (EC5/DTU 31.1) : chevrons et pannes sur appuis simples — charge lineaire (couverture 0,8 kN/m2 + neige 0,45) x entraxe, moment de flexion, contrainte s = M/W face au C24 (16,6 MPa), fleche <= L/200, section commerciale choisie (45x95 -> 75x250). action=dimensionner (defaut, portee_m + entraxe_m) | verifier (sections declarees dans scene.charp","read_only":true},{"name":"cao_bim_mep_aeraulique","title":"Size a complete air duct network (friction method, branch balancing) of a scene (indicative)","description":"Appelez quand vous devez dimensionner le RESEAU DE GAINES COMPLET : debits des bouches cumules de l'aval vers la source, diametre normalise de chaque troncon par la friction constante (1 Pa/m), perte de chaque BRANCHE source->bouche, branche critique identifiee et REGISTRES d'equilibrage deduits pour les autres branches ; verification des diametres declares (vitesse <= 5 m/s, friction <= 1,5 Pa/m,","read_only":true},{"name":"cao_bim_4d_cpm","title":"Produce the S-curve dated by the critical path and the cash flow of a scene (indicative)","description":"Appelez quand vous voulez la COURBE EN S DATEES par le chemin critique (4D avance) : chaque tache du CPM recoit ses dates reelles (ES/EF), le cout 5D est reparti par poids de tache (terrassement 5 %, structure 30 %, enveloppe 25 %, second oeuvre 25 %, finitions 15 %), la courbe cumulee sort jour par jour en dates ISO, et la TRESORERIE mensuelle s'en deduit (acompte 30 %, mensualites au cout du moi","read_only":true},{"name":"cao_bim_vrd","title":"Check roads and utility networks (slopes, manholes, connections) of a scene (indicative)","description":"Appelez quand vous devez verifier les VRD (voiries et reseaux divers) d'une scene : pentes de voirie entre 0,5 et 15 %, regards au moins tous les 30 m et a chaque changement de direction, branchements EU (pente 1-2,5 %, diametre >= 100 mm) et EP (0,5-10 %), contre-pentes detectees, raccordements hors gel (>= 0,80 m) avec grillage avertisseur. scene : vrd {voiries [{pente_pct}], regards [{distance_","read_only":true},{"name":"cao_bim_evacuation","title":"Check evacuation signage, emergency lighting, plans and escape paths of a scene (indicative)","description":"Appelez quand vous devez verifier l'EVACUATION d'un batiment : issues signalees (pictogrammes eclaires), BAES (>= 1 par issue + 1 par niveau), plan d'evacuation affiche a chaque niveau, issues degagees, et PARCOURS horizontaux (distance piece -> issue <= 40 m avec positions declarees). scene : niveaux, ouvertures [{type: porte, fonction: issue, signalee, encombree?, x, y}], pieces [{nom, x, y}], b","read_only":true},{"name":"cao_bim_certification","title":"Consolidate the environmental certification scorecard (HQE/BREEAM-like) of a scene","description":"Appelez quand vous voulez le SCORECARD DE CERTIFICATION ENVIRONNEMENTALE (HQE/BREEAM-like) d'une scene : 4 familles (energie-carbone : etancheite, confort d'ete, carbone ACV ; environnement-eau : biotope, eaux pluviales, economie circulaire ; confort-sante : acoustique, eclairage, QAI ; usage-exploitation : incendie, accessibilite, evacuation), score 0-100 par critere, moyenne par famille, niveau ","read_only":true},{"name":"cao_bim_eau","title":"Check drinking water consumption, savings and rainwater reuse of a dwelling scene (indicative)","description":"Appelez quand vous devez verifier la CONSOMMATION D'EAU POTABLE d'un logement : estimation annuelle (120 L/j/occupant, -20 % avec appareils economes — chasse 3/6 L, mousseurs), recuperation d'eau de pluie (arrosage 60 L/m2/an + sanitaires, couverture par la citerne declaree), jardin > 100 m2 sans citerne signale, compteur sectoriel et fuites reparees exigees. scene : occupants, appareils_economes,","read_only":true},{"name":"cao_bim_toiture_terrasse","title":"Check flat-roof waterproofing (NF DTU 43 slopes, upstands, drains) of a scene (indicative)","description":"Appelez quand vous devez verifier une TOITURE-TERRASSE (NF DTU 43) : pente de la partie courante entre 1 et 5 %, releves d'etancheite >= 150 mm au-dessus du niveau fini, evacuations EP (>= 2, diametre >= 100 mm, une par tranche de 150 m2), protection lourde ou vegetalisee si terrasse accessible. scene : toitures_terrasses [{nom, pente_pct, surface_m2, releves [{hauteur_mm}], evacuations [{diametre","read_only":true},{"name":"cao_bim_vitrages","title":"Check safety glazing (NF DTU 39 sills, doors, glass guards) of a scene (indicative)","description":"Appelez quand vous devez verifier les VITRAGES DE SECURITE (NF DTU 39 / NF P78) : vitrages en allege (bas < 1,00 m, chute > 1 m -> feuillete 44.2), portes vitrees pleine hauteur (feuillete 44.2 ou trempe REPERE), garde-corps vitres (feuillete 44.2) et reperage des trempes (logotype). scene : vitrages [{element, localisation: allege|porte|garde_corps, type_vitrage: 44.2|trempe|simple..., bas_m?, ha","read_only":true},{"name":"cao_bim_condensation","title":"Check condensation risk of walls (Glaser method) of a scene (indicative)","description":"Appelez quand vous devez verifier le RISQUE DE CONDENSATION d'une paroi (methode de Glaser, NF EN ISO 13788) : profil de temperature et de pression de vapeur a travers les couches declarees (materiau, epaisseur_mm, lambda/mu par defaut), condensation interne detectee si la pression de vapeur depasse la pression saturante, pare-vapeur cote chaud exige (Sd >= 18 m) devant l'isolant fibreux, pare-vap","read_only":true},{"name":"cao_bim_bardage","title":"Check ventilated cladding (air gap, rain screen, fixings, clearances) of a scene (indicative)","description":"Appelez quand vous devez verifier un BARDAGE RAPPORTE (regles professionnelles) : lame d'air ventilee >= 20 mm, pare-pluie HPV declare, ossature (bois/alu) et fixations (espacement <= 600 mm), jeu en pied >= 150 mm (rejingot) et joints de dilatation tous les 10 m. scene : bardages [{nom, ossature, lame_air_mm, pare_pluie, fixation {espacement_mm}, jeu_pied_mm, joint_dilatation_m}]. Indicatif — reg","read_only":true},{"name":"cao_bim_lod_instances","title":"Check the LOD/LOI of placed instances against the project phase (indicative)","description":"Appelez quand vous devez verifier le LOD/LOI D'EXECUTION des instances posees : chaque instance atteint LOD 350 (dimensions nominales), 400 (+ position) ou 500 (fabricant + reference, tel que construit), et le niveau atteint est confronte a l'exigence de la phase (execution : LOD >= 400, LOI >= 400 — dce : 350). phase : esquisse | aps | apd | dce | execution. Indicatif — le protocole LOD signe (BE","read_only":true},{"name":"cao_bim_bordereau_lots","title":"Produce per-lot EXE quantity bills (concrete, formwork, steel) of a scene (indicative)","description":"Appelez quand vous voulez les BORDEREAUX QUANTITATIFS EXE par lot (unites d'oeuvre d'agence) : beton m3 (murs banches, dalles), COFFRAGE m2 (sous-faces + rives de dalles, 2 faces des murs), acier kg (bordereau d'armatures), cloisons m2, couverture u, menuiseries u — avec les ratios de controle (coffrage/beton 5-15 m2/m3, densite d'acier 30-250 kg/m3) et les lots vides listes. Indicatif — metre con","read_only":true},{"name":"cao_bim_foudre","title":"Check lightning protection (risk analysis, air terminal, SPDs, earthing) of a scene (indicative)","description":"Appelez quand vous devez verifier la PROTECTION FOUDRE (NF EN 62305) : analyse du risque annuel (Ng x surface equivalente 9πH2 x environnement x usage), paratonnerre (PDA ou cage maillee) requis si risque > 1e-4/an (seuil simplifie), parafoudres sur les tableaux sensibles (ERP/industriel), liaison equipotentielle foudre et prise de terre <= 10 Ω des qu'un paratonnerre est pose. scene : hauteur_m (","read_only":true},{"name":"cao_bim_soutenement","title":"Check retaining walls (Rankine earth pressure, sliding, overturning, drainage) of a scene (indicative)","description":"Appelez quand vous devez verifier un MUR DE SOUTENEMENT (Rankine, EC7) : poussee active des terres (Ka = tan2(45-phi/2), avec surcharge), securite au GLISSEMENT (mu x poids / poussee >= 1,5) et au RENVERSEMENT (moment stabilisant / renversant >= 1,5), drainage (barbacanes/drain) contre la poussee hydraulique. scene : soutenements [{nom, hauteur_m, epaisseur_tete_m, epaisseur_pied_m, largeur_semell","read_only":true},{"name":"cao_bim_diagnostics","title":"Check mandatory pre-works diagnostics (asbestos DTA, lead CREP, termites) of a scene","description":"Appelez quand vous devez verifier les DIAGNOSTICS OBLIGATOIRES AVANT TRAVAUX : DTA amiante (batiment d'avant 1997, valable 6 ans, diagnostiqueur certifie), CREP plomb (avant 1949, a actualiser si plomb detecte depuis plus d'un an), etat parasitaire termites (zones reglementees). scene : annee_construction, travaux_prevus, zone_termites, diagnostics {amiante: {date, presence, diagnostiqueur}, plomb","read_only":true},{"name":"cao_bim_intrusion","title":"Check burglary resistance (EN 1627 classes, A2P alarm, lighting, roof access) of a scene (indicative)","description":"Appelez quand vous devez verifier la SECURITE INTRUSION (EN 1627 / NF A2P) : classification des acces (porte d'entree et fenetres accessibles >= RC2), alarme certifiee NF A2P pour les locaux sensibles (commerce, bureau, ERP), eclairage exterieur automatique et acces toiture verrouilles. scene : usage, intrusion {acces [{element, type: porte|fenetre, classe_rc, accessible?}], alarme {certifiee_nf_a","read_only":true},{"name":"cao_bim_sprinkler","title":"Check automatic fire suppression (water reserve, pumps, alarm, APSAD) of a scene (indicative)","description":"Appelez quand vous devez verifier un SPRINKLAGE (regles APSAD, indicatif) : necessite (entrepot/commerce/industrie > 3 000 m2 ou ERP 1re-2e categorie), reserve d'eau >= densite de la classe de risque (OH1 4 / OH2 5 / OH3 7,5 / OH4 10 L/min/m2) x 250 m2 x 60 minutes, deux pompes (principale + secours) et alarme reportee. scene : usage, surface_m2, categorie_erp, sprinkler {classe_risque, reserve_m3","read_only":true},{"name":"cao_bim_signaletique","title":"Check accessible signage (pictograms, tactile strips, contrasts) of a scene (indicative)","description":"Appelez quand vous devez verifier la SIGNALETIQUE PMR (arrete 20/04/2017) : pictogrammes d'accessibilite (sourds/malentendants) aux accueils sonorises, bandes podotactiles d'eveil de vigilance en haut d'escalier, contrastes visuels (portes, nez de marche, equipements), signaletique continue du cheminement et informations tactiles. scene : sonorisation, escaliers, pieces, signaletique {pictogrammes","read_only":true},{"name":"cao_bim_vibrations","title":"Check floor vibration comfort (EC5 natural frequency) of a scene (indicative)","description":"Appelez quand vous devez verifier le CONFORT VIBRATOIRE d'un plancher (EC5) : frequence propre estimee f1 ~ 18/racine(delta) (delta = fleche sous charge permanente), exigence >= 8 Hz en residentiel, fleche <= 14 mm, usage declare. scene : planchers_vibration [{nom, portee_m, charge_kn_m2, e_mpa, i_m4_par_m OU section {b_mm, h_mm} + entraxe_mm, usage: habitation|bureau|public}]. Indicatif — note EC","read_only":true},{"name":"cao_bim_legionelles","title":"Check Legionella prevention of a collective DHW network (temperatures, loop, purge) of a scene (indicative)","description":"Appelez quand vous devez verifier la PREVENTION LEGIONELLES d'un reseau ECS collectif (arretes 30/11/2005 et 1/02/2010) : temperature de stockage >= 55 C, bouclage avec retour >= 50 C, purge de fond de ballon periodique (carnet sanitaire) et antennes (bras morts) <= 3 m ou 3 L. scene : ecs {type: collectif|individuel, stockage_temp_c, bouclage, retour_boucle_temp_c, purge_fond_de_ballon, antennes ","read_only":true},{"name":"cao_bim_eclairage_exterieur","title":"Check outdoor lighting (levels, uniformity, light pollution) of a scene (indicative)","description":"Appelez quand vous devez verifier l'ECLAIRAGE EXTERIEUR (EN 12464-2, arrete 27/12/2018) : niveaux par zone (parking 20 lux, cheminement 10, acces 30), uniformite parking >= 0,25, densite de puissance <= 2 W/m2, extinction nocturne (23h-6h) ou detection et luminaires orientes vers le bas (pollution lumineuse). scene : eclairage_exterieur {zones [{nom, type: parking|cheminement|acces|peripherie, sur","read_only":true},{"name":"cao_bim_aev","title":"Check window/door AEV classification (air, water, wind) against exposure of a scene (indicative)","description":"Appelez quand vous devez verifier le CLASSEMENT AEV des menuiseries (NF DTU 36.5) : classement A*E*V* (air/eau/vent) >= exigence de l'exposition (faible A2E3V2, moderee A3E5V2, forte A4E6V3), exposition declaree, pose avec joints d'etancheite et fixations. scene : menuiseries_aev [{element, exposition: faible|moderee|forte, classement: 'A3E5V2', pose {joints_etancheite, fixations}}]. Indicatif — a","read_only":true},{"name":"cao_bim_emergence_sonore","title":"Check outdoor equipment noise emergence at the property line (R. 1334-31) of a scene (indicative)","description":"Appelez quand vous devez verifier l'EMERGENCE SONORE des equipements exterieurs (PAC, clim, VMC — code de la sante R. 1334-31) : niveau a la limite de propriete Lp = Lw - 20.log(d) - 11 (ecran -5 dB), emergence face au bruit residuel declare — seuils 5 dB(A) jour et 3 dB(A) nuit — ecran acoustique a prevoir si depassement, appareils nocturnes verifies avec le critere nuit. scene : bruit_residuel {","read_only":true}],"server_info":{"name":"synergieloc-immobilier","version":"1.0.0"},"category":"legal","tags":["real-estate","agents","security"],"kind":"remote","source":"registry","submitted":{},"first_party":true,"domain_rank":null,"score":100,"indexable":true,"first_seen":"2026-07-14","stars":0,"badges":[],"sponsor":null,"page":"https://agentsindex.org/agents/fr-synergieloc-immobilier/"}