{"id":"sa.com.renewablevision/renewable-vision","slug":"sa-com-renewablevision-renewable-vision","title":"Renewable Vision energy data","description":"Saudi and regional energy data: registers, series, trackers, briefs; atlas layers need a member key.","version":"0.2.0","publisher":{"kind":"domain","id":"renewablevision.com.sa","label":"renewablevision.com.sa","url":"https://renewablevision.com.sa"},"website":"https://renewablevision.com.sa/en/data/api","repository":"","remotes":[{"type":"streamable-http","url":"https://renewablevision.com.sa/api/mcp"}],"packages":[],"published":"2026-11-10","updated":"2026-11-10","status":"online","auth":"","latency_ms":1113,"checked":"2026-11-19","uptime":100,"checks":3,"tools":[{"name":"list_datasets","title":"Dataset catalogue","description":"The catalogue of everything this platform publishes: each dataset with its id, title, topic, publisher, licence, coverage, record count, refresh cadence and the page it is published on; each mirrored statistical series with its id, publisher, unit and period range; and the three official registers mirrored weekly. Call this first when you do not yet know which dataset, series or register holds the","read_only":true},{"name":"get_register","title":"Official register rows","description":"Rows from one official Saudi register as this platform last mirrored it. register: sppc (Saudi Power Procurement Company, the Principal Buyer — every solar and wind project with its contracted capacity in MW and status connected|construction), swpc (Saudi Water Partnership Company / SHARAKAT — independent desalination, sewage treatment, transmission and strategic storage projects with capacity, re","read_only":true},{"name":"search_projects","title":"Search the project trackers","description":"Match a name, developer, country, region or city across the project trackers and return the matching rows with their capacities, largest first. dataset: renewables (Saudi renewable projects — technology, capacity MW, status operational|construction|tendered|announced, developers, LCOE), captive (Saudi captive and corporate solar: corporate PPAs, plants owned by the factory or farm they supply, pla","read_only":true},{"name":"get_company","title":"One company in the renewables tracker","description":"One developer or shareholder named in the Saudi Renewables Tracker, by the slug on its page (acwa-power, masdar, edf-renewables, saudi-aramco-power …; search_projects returns developers as published). Returns every project that names it with the equity share the developers publish, its capacity by stage (operational, construction, tendered) and by technology in MW, the capacity attributable by pub","read_only":true},{"name":"get_series","title":"One mirrored statistical series","description":"One statistical series this platform mirrors from a publisher (the KAPSARC energy data portal, JODI, IRENA, the IMF, the IEA, the World Bank, Our World in Data, the CFTC, Climate TRACE, UN Comtrade), with its publisher, unit, licence, period range, a summary over the window (latest value per category, minimum, maximum, first-to-last change) and its newest points. Narrow the window with from and to","read_only":true},{"name":"list_changes","title":"Change ledger","description":"Every row-level change this platform observed in an official register, a mirrored series or a tracker since a date, newest first, with the value on both sides and the size of the move. This answers \"what moved since I last looked\" in one call. Magnitudes carry their own unit and are not comparable across units — a water plant’s cubic metres a day are not megawatts.","read_only":true},{"name":"whats_due","title":"What is expected next","description":"The publications and milestones this platform expects next: each mirrored source with the date its refresh is due and how many days late it is, and the tracked projects carrying a stated commercial operation year. Schedule facts, not forecasts.","read_only":true},{"name":"latest_brief","title":"Latest weekly brief","description":"The current weekly energy brief: its subject, the figures it opens on, every block of its text and the permanent page for the week. Compiled every Sunday from the change ledger — what moved, what the registers did, what is due. Use it for \"what happened this week in Saudi energy\".","read_only":true},{"name":"get_brief","title":"One week’s brief","description":"One week’s brief at its permanent address, by ISO week, e.g. 2026-W38. A brief never changes after the Sunday it was written, so it is safe to cite. Call list_briefs for the weeks published.","read_only":true},{"name":"list_briefs","title":"Weekly briefs published","description":"Every weekly brief published, newest first, with its ISO week, the Sunday it covers up to, its subject in both languages and its page. Use it to find the week to pass to get_brief.","read_only":true},{"name":"list_reports","title":"Report library","description":"The report library: every report this company has filed, newest edition first, with its id, title, summary, scope, sector, edition, the date its figures were compiled, page count and cover. Public fields only — each report’s PDF and data pack are free to members and are named by their member download route. Pass an id to get_report for the quoted definitions and the sources.","read_only":true},{"name":"get_report","title":"One report","description":"One report at its permanent address: the caption as prose, the definitions of its headline figures quoted from its own notes, its sources, the cover and the public preview pages. Its figures are as filed on contentUpdated; the live dashboards are separate tools and may read differently. Public fields only — the PDF and the data pack stay behind free membership.","read_only":true},{"name":"power_balance","title":"Saudi power balance","description":"Saudi renewable capacity operational, under construction and tendered, against the 2030 National Renewable Energy Program target and against the Principal Buyer’s own register, with what changed since last month and which projects the register corrected on stage. With month, the balance as it was stored for that month rather than recomputed.","read_only":true},{"name":"fleet_outlook","title":"Solar fleet outlook","description":"The week ahead for the tracked Saudi solar fleet: expected generation against the long-run normal, day by day, with the peak temperature forecast at the main load centres. Computed from an irradiance forecast, NASA POWER normals and each plant’s own published annual generation.","read_only":true},{"name":"oil_balance","title":"Oil balance model","description":"This platform’s oil balance model run on its live inputs: the lever set, a summary, and the monthly path of anchor, price, band, demand, supply, stock change and inventories, with the source and status of every input. scenario: base, tight (stronger demand against tighter supply), transition (weaker demand with more displacement) or flood (more supply and more elastic shale). The path is modelled ","read_only":true},{"name":"solar_resource","title":"Solar and wind resource for an area","description":"The long-run (2001–2020) NASA POWER climatology for one 0.5° cell (about 55 km): global horizontal and direct normal irradiance in kWh/m²/day, wind speed at 50 m in m/s, air temperature in °C and aerosol optical depth at 550 nm (dust, and so panel soiling), each as an annual mean and by month. Ask by a tracked project id (answered for its locality, never its site), by a place given as \"north,east\"","read_only":true},{"name":"gcc_series","title":"GCC country series","description":"Annual country series for Saudi Arabia, the UAE, Oman, Qatar, Kuwait and Bahrain: installed solar, wind and renewable capacity (IRENA, MW); solar and wind generation (TWh), their shares of electricity, demand in total and per person and the carbon intensity of electricity (Our World in Data); CO2 per person, population and renewable share of final energy (World Bank). Each metric carries its publi","read_only":true},{"name":"news_mentions","title":"Headlines naming a project or company","description":"Recent headlines on Saudi and GCC energy (renewables, storage, hydrogen, power, oil and gas, water, data-centre power), gathered every three hours from publishers’ own feeds and the GDELT Project: the headline, its link, the publisher’s domain, the date and the language only. Filter by a tracked project id or a company slug; a headline is tagged only when it names the project or company unambiguou","read_only":true},{"name":"search","title":"Search the platform","description":"Ranked matches across the datasets, the mirrored series, the published insight articles and the tracked projects — the same index the site’s own command palette reads. Use it when you do not know which page or dataset covers a subject; each result carries the page to cite.","read_only":true},{"name":"project_output_estimate","title":"Estimated output of solar projects (PVGIS model)","description":"Estimated annual generation (GWh) and capacity factor of solar projects in the Saudi tracker, the GCC tracker and the Saudi captive segment, modelled with PVGIS (EU JRC) at the town or region centroid — never the plant — for a fixed array at the optimal tilt and for a single-axis tracker, with totals by tracker and stage. Pass `project` (a tracker id such as sudair-pv-1500-mw) for one project, or ","read_only":true},{"name":"equipment_trade","title":"Clean-energy equipment imports into the GCC (UN Comtrade, derived)","description":"Imports into Saudi Arabia, the UAE, Oman, Qatar, Kuwait and Bahrain from 2015 of PV cells and modules, lithium-ion cells, wind turbines, static converters, electrolysis machines and large transformers, by product group, year and the five largest partners (partner `WLD` is the total). US dollars as declared (CIF). Derived aggregates only: UN Comtrade does not allow its rows to be republished. HS 85","read_only":true},{"name":"gcc_emissions","title":"GCC greenhouse gas emissions (Climate TRACE, Climate Watch, OWID)","description":"National greenhouse gas emissions of the six GCC states by year: Climate TRACE by sector (power, fossil-fuel-operations, manufacturing and others; MtCO2e, 100-year basis), the Climate Watch historical series by sector, and Our World in Data per-person and intensity indicators. Every row names its source; the methods differ, so never add one source to another. National aggregates only.","read_only":true},{"name":"oil_outlook","title":"Oil price outlook","description":"This platform’s oil price and production strategy model: Brent today, the model’s monthly path for the next 24 months under current Saudi and OPEC+ policy (anchored to the EIA outlook and the futures strip, with the unanchored structural path beside it) with a Monte Carlo fan (P10–P90), the OECD stocks and balance behind it, the EIA Short-Term Energy Outlook and the WTI futures strip as benchmarks","read_only":true},{"name":"oil_scenario","title":"Oil production scenario","description":"Runs one preset Saudi production path through the model and returns what it implies: Brent by month for 24 months and by year to 2050, Saudi crude exports, oil revenue, the fiscal balance against the IMF breakeven, market share, spare capacity, the net present value of revenue and the US shale response, with the difference from holding current policy. preset: hold, gradual, accelerated, deeperCut ","read_only":true},{"name":"find_projects","title":"Find projects across every tracker","description":"Search and filter the whole project index, the one the site’s assistant reads: the Saudi, captive, GCC, Regional and World Renewables Trackers, Saudi battery storage, the Saudi, GCC, Regional and World Data Centre Trackers, the CCUS tracker, the IEA hydrogen map and the Saudi water, AI and dedicated-systems registers. Filter by free text, place (a country, gcc, mena …), sector, technology, stage o","read_only":true},{"name":"aggregate_projects","title":"Count and add up projects","description":"Count projects, add up their stated capacity or their disclosed investment, grouped by country, place, stage, technology, sector, developer, year (of commercial operation) or source (tracker), optionally split by stage, technology, sector or country, over any filter find_projects takes. Computed by the same engine as the site’s assistant, so the figures equal the ones /assistant gives for the same","read_only":true},{"name":"get_project","title":"One project, with its sources","description":"Everything the site holds on one project, by its id from find_projects, search_projects or a project page (/data/projects/{id}), whichever tracker lists it: name, sector, technology, capacity as stated with any other ratings and what the figure covers, stage with the source’s own words, place (locality and region only, never coordinates), dated milestones (planned or actual), disclosed investment,","read_only":true},{"name":"tracker_summary","title":"A tracker’s headline figures","description":"A tracker’s headline figures as its own page prints them, with the date they are true as of, read exactly as the site’s assistant reads them: projects and capacity by stage, and by country for the GCC, Regional and World Renewables Trackers. tracker: saudi-renewables (stages as the page counts them, the Principal Buyer’s register leading where it differs), gcc-renewables, regional-renewables, worl","read_only":true}],"server_info":{"name":"renewable-vision","version":"0.1.0","title":"Renewable Vision energy data"},"category":"project","tags":["analytics","developer","productivity"],"kind":"remote","source":"registry","submitted":{},"first_party":true,"domain_rank":null,"score":100,"indexable":true,"first_seen":"2026-11-10","stars":0,"badges":["new"],"sponsor":null,"page":"https://agentsindex.org/agents/sa-com-renewablevision-renewable-vision/"}