Agents Index

exascale.build

Online

US ISO interconnection queues and cited energy data. 25 free queries, then $49/mo or $490/yr.

Visit publisherConnectJSON

What it can do: 66 tools

  • list_capabilities_v1 read-onlyList available exascale.build data capabilities for agent discovery before querying. Also call this BEFORE stating that a capability is not available — client tool lists are cached and this surface grows; anything listed
  • get_source_evidence_v1 read-onlyFetch and hash-verify the raw source row behind a returned citation. Pass a citation object inside `params`. Two ready-to-pass shapes come straight from the query tools: each aggregate row's `citations[ref].verify` obje
  • describe_capability_v1 read-onlyDescribe any served capability by name — the generic twin of the named describe tools. Pass `capability` as either a capability id from list_capabilities_v1 (e.g. "power.capacity") or a query primitive name (e.g. "query
  • query_capability_v1 read-onlyQuery any served capability by name — the generic twin of the named query tools, reaching every capability including ones newer than your client's cached tool list. Pass `capability` as either a capability id from list_
  • describe_power_capacity_v1 read-onlyDescribe valid filters, groupings, metrics, detail fields, and citation fields for power.capacity.
  • query_power_capacity_v1 read-onlyQuery verified U.S. generator-level operating, planned, retired, or canceled power capacity from EIA-860M. Use this for capacity questions by state/jurisdiction, county FIPS, source-reported balancing authority code, fu
  • describe_power_generation_v1 read-onlyDescribe valid filters, groupings, atoms, metrics, detail fields, and citation fields for power.generation.
  • query_power_generation_v1 read-onlyQuery verified U.S. monthly net electricity generation (MWh) from EIA-923. Use this for "how much was generated" questions by state, source-reported balancing authority code, fuel, prime mover, sector, plant, or generat
  • describe_power_asset_ownership_v1 read-onlyDescribe annual EIA-860 ownership filters, convention, metrics, and exact-cell citations.
  • query_power_asset_ownership_v1 read-onlyQuery verified annual EIA-860 generator ownership. Returns the Owner schedule's raw owner names and ownership shares for each `eia_plant_id` + `generator_id`. `percent_owned` is the workbook's raw fraction of one (0.6 =
  • describe_power_fuel_cost_v1 read-onlyDescribe EIA-923 receipt/cost filters, raw units, missing semantics, and exact-cell citations.
  • query_power_fuel_cost_v1 read-onlyQuery verified raw EIA-923 fuel receipts and delivered fuel costs. Returns one Page 5 Fuel Receipts and Costs row per published receipt: plant/month, fuel, supplier, purchase type, source physical quantity, and delivere
  • describe_power_plant_costs_v1 read-onlyDescribe native-XBRL Form 1 plant-cost facts, units, coverage, and exact-fact citations.
  • query_power_plant_costs_v1 read-onlyQuery accepted native-XBRL FERC Form 1 large-steam plant facts. Returns one separately cited XBRL fact per respondent, report year, raw plant name, and source concept: installed capacity, net generation, plant-cost bala
  • describe_natural_gas_prices_v1 read-onlyDescribe the EIA Henry Hub and state electric-power gas-price atoms, units, aggregate grain, missingness, vintages, and citations.
  • query_natural_gas_prices_v1 read-onlyQuery verified EIA natural-gas price records from two public series. `atom="henry_hub_daily_spot"` returns one trading-day Henry Hub spot price in EIA's published $/MMBtu unit (series RNGWHHD). `atom="state_electric_pow
  • describe_power_demand_v1 read-onlyDescribe valid filters, groupings, metrics, detail fields, and citation fields for power.demand.
  • query_power_demand_v1 read-onlyQuery verified U.S. hourly electricity demand (MW) by balancing authority from EIA-930. Use this for "how much load" questions at the hourly balancing-authority grain: filter or group by `balancing_authority_code`, `reg
  • describe_power_demand_rollup_v1 read-onlyDescribe valid filters, groupings, metrics, detail fields, and citation fields for power.demand_rollup.
  • query_power_demand_rollup_v1 read-onlyQuery verified U.S. hourly electricity demand (MW) as EIA's own published national and regional totals from the EIA Grid Monitor (region-data). Use this for "how much load for the whole country, or a region" questions.
  • describe_power_retail_sales_v1 read-onlyDescribe valid filters, groupings, metrics, detail fields, and citation fields for power.retail_sales.
  • query_power_retail_sales_v1 read-onlyQuery verified U.S. annual retail electricity sales — billed MWh, revenue, and customer counts — by utility, state, and customer sector from EIA-861. Use this for "who sold how much power to whom" questions at the annua
  • describe_power_interconnection_queue_v1 read-onlyDescribe valid filters, groupings, metrics, detail fields, and citation fields for power.interconnection_queue.
  • query_power_interconnection_queue_v1 read-onlyQuery the MISO generator interconnection queue — the public waiting line of projects that have REQUESTED to connect to the MISO grid (the 15-state Midwest/South footprint). Returns cited, project-level records: requeste
  • describe_power_interconnection_queue_pjm_v1 read-onlyDescribe valid filters, groupings, metrics, detail fields, and citation fields for power.interconnection_queue_pjm.
  • query_power_interconnection_queue_pjm_v1 read-onlyQuery the PJM New Services (interconnection) queue — the public waiting line of projects that have REQUESTED to connect to the PJM grid (the mid-Atlantic RTO incl. Northern Virginia, PA, NJ, MD, OH, VA, WV and more). Re
  • describe_power_interconnection_queue_pjm_cycle_v1 read-onlyDescribe valid filters, groupings, metrics, detail fields, and citation fields for power.interconnection_queue_pjm_cycle.
  • query_power_interconnection_queue_pjm_cycle_v1 read-onlyQuery PJM's cluster/cycle service-request grid — the cluster view of PJM's interconnection process: the TC1/TC2 transition cycles (re-processing the pre-Order-2023 serial backlog) and the reopened steady-state cycles (C0
  • describe_power_interconnection_queue_caiso_v1 read-onlyDescribe valid filters, groupings, metrics, detail fields, and citation fields for power.interconnection_queue_caiso.
  • query_power_interconnection_queue_caiso_v1 read-onlyQuery the CAISO generator interconnection queue — California ISO's public Public Queue Report, the waiting line of projects that have REQUESTED to connect to the CAISO grid (California, plus the out-of-state edges it stu
  • describe_power_interconnection_queue_nyiso_v1 read-onlyDescribe valid filters, groupings, metrics, detail fields, and citation fields for power.interconnection_queue_nyiso.
  • query_power_interconnection_queue_nyiso_v1 read-onlyQuery the NYISO generator + load interconnection queue — New York ISO's public waiting line of projects that have REQUESTED to connect to the New York grid. Uniquely among ISOs, NYISO publishes a Load Projects tab — load
  • describe_power_interconnection_queue_isone_v1 read-onlyDescribe valid filters, groupings, metrics, detail fields, and citation fields for power.interconnection_queue_isone.
  • query_power_interconnection_queue_isone_v1 read-onlyQuery the ISO-NE generator interconnection queue — ISO New England's public IRTT "public queue" report, the waiting line of projects that have REQUESTED to connect to the New England grid (CT, MA, ME, NH, RI, VT). Retur
  • describe_power_interconnection_queue_ercot_v1 read-onlyDescribe valid filters, groupings, metrics, detail fields, and citation fields for power.interconnection_queue_ercot.
  • query_power_interconnection_queue_ercot_v1 read-onlyQuery the ERCOT generator interconnection queue — ERCOT's public GIS Report (EMIL PG7-200-ER), the waiting line of generation projects that have REQUESTED to connect to the ERCOT (Texas) grid. Returns cited, project-lev
  • describe_power_interconnection_queue_spp_v1 read-onlyDescribe valid filters, groupings, metrics, detail fields, and citation fields for power.interconnection_queue_spp.
  • query_power_interconnection_queue_spp_v1 read-onlyQuery the SPP generator interconnection queue — Southwest Power Pool's public GI Summary report, the waiting line of generation projects that have REQUESTED to connect to the SPP grid (the ~14-state central-US RTO: OK, K
  • describe_power_price_ercot_v1 read-onlyDescribe valid filters, groupings, metrics, detail fields, and citation fields for power.price_ercot.
  • query_power_price_ercot_v1 read-onlyQuery verified ERCOT wholesale electricity prices — ERCOT's Day-Ahead Market Settlement Point Prices ($/MWh, EMIL NP4-190-CD), the price cleared the day before each operating day at every ERCOT (Texas) settlement point,

…and 26 more.

Connect it

Claude Code
claude mcp add --transport http exascale-build https://api.exascale.build/mcp
Claude.ai / ChatGPT
Settings → Connectors → Add custom connector
URL: https://api.exascale.build/mcp
Cursor (~/.cursor/mcp.json)
{
  "mcpServers": {
    "exascale-build": {
      "url": "https://api.exascale.build/mcp"
    }
  }
}
VS Code (.vscode/mcp.json)
{
  "servers": {
    "exascale-build": {
      "type": "http",
      "url": "https://api.exascale.build/mcp"
    }
  }
}

Questions

What does exascale.build do?

US ISO interconnection queues and cited energy data. 25 free queries, then $49/mo or $490/yr. It exposes 66 tools to AI assistants.

What tools does exascale.build provide?

66 tools, including list_capabilities_v1, get_source_evidence_v1, describe_capability_v1, query_capability_v1, describe_power_capacity_v1, query_power_capacity_v1, describe_power_generation_v1, query_power_generation_v1, describe_power_asset_ownership_v1, query_power_asset_ownership_v1, describe_power_fuel_cost_v1, query_power_fuel_cost_v1….

How do I connect exascale.build to Claude, ChatGPT or Cursor?

Add the remote MCP endpoint https://api.exascale.build/mcp as a custom connector or MCP server. Copy-paste setup is on this page.

Does exascale.build require an account or API key?

No sign-in was needed to list its tools. Individual tools may still need an account or API key.

Is exascale.build online?

As of 2026-11-19 our probe found it online. It answered 100% of our last 3 checks.

Who publishes exascale.build?

exascale.build. The official MCP Registry verified that the publisher controls this domain before accepting the listing.

Similar in Databases & Data